Glen Canyon Dam and Powerplant: Constructed 1957-1966; Colorado River Storage Project, Arizona-Utah1970 - Glen Canyon Dam (Ariz.) - 658 pages |
From inside the book
Results 1-5 of 100
Page xxiii
... floor architectural plan 230. Visitor center - Basement and machinery room architectural plans 231. Visitor center outside architecture - South and east elevations 232. Visitor center outside architecture - North and west elevations 233 ...
... floor architectural plan 230. Visitor center - Basement and machinery room architectural plans 231. Visitor center outside architecture - South and east elevations 232. Visitor center outside architecture - North and west elevations 233 ...
Page xxv
... floor of control room • 294. Carl Hayden Visitor Center on the canyon rim overlooking Glen Canyon Dam on the Colorado River near Page , Ariz . . . 295. Aerial view looking east over visitor center construction Page 499 500 501 503 509 ...
... floor of control room • 294. Carl Hayden Visitor Center on the canyon rim overlooking Glen Canyon Dam on the Colorado River near Page , Ariz . . . 295. Aerial view looking east over visitor center construction Page 499 500 501 503 509 ...
Page 21
... floor of drift DRIFT NO . I 10 DRIFT BEARING- N 68 ° 55'30 " E STA 0 + 00 Open cut- Portal 0 + 10 0+ 20 0 + 30 0 + 40 0+ 50 HORIZONTAL SECTION B - B Horizontal section 4 feet above floor of drift DRIFT NO . 2 Figure 11. - Logs of drifts ...
... floor of drift DRIFT NO . I 10 DRIFT BEARING- N 68 ° 55'30 " E STA 0 + 00 Open cut- Portal 0 + 10 0+ 20 0 + 30 0 + 40 0+ 50 HORIZONTAL SECTION B - B Horizontal section 4 feet above floor of drift DRIFT NO . 2 Figure 11. - Logs of drifts ...
Page 34
... floor and ceiling of the tunnels , the " down " holes being limited to about 75 feet . These holes were to be spaced at 30 - foot centers , although intermediate drainage pipes were to be embedded in the floors of the tunnels at 10 ...
... floor and ceiling of the tunnels , the " down " holes being limited to about 75 feet . These holes were to be spaced at 30 - foot centers , although intermediate drainage pipes were to be embedded in the floors of the tunnels at 10 ...
Page 35
... floor @ 10's crs . -El 3390.00 Left spillway tunnel- -Drainage holes @ 30't crs or as directed- Drainage holes spaced @ 10 crs along , profile unless otherwise shown-- BLOCK NO 13187 50 Foundation gallery El . 3187.50 Drainage holes ...
... floor @ 10's crs . -El 3390.00 Left spillway tunnel- -Drainage holes @ 30't crs or as directed- Drainage holes spaced @ 10 crs along , profile unless otherwise shown-- BLOCK NO 13187 50 Foundation gallery El . 3187.50 Drainage holes ...
Contents
55 | |
70 | |
72 | |
92 | |
100 | |
174 | |
176 | |
182 | |
189 | |
201 | |
207 | |
211 | |
216 | |
217 | |
226 | |
230 | |
236 | |
243 | |
264 | |
267 | |
272 | |
279 | |
303 | |
310 | |
316 | |
317 | |
324 | |
333 | |
333 | |
341 | |
356 | |
365 | |
418 | |
424 | |
430 | |
436 | |
446 | |
453 | |
459 | |
462 | |
469 | |
471 | |
475 | |
482 | |
488 | |
494 | |
497 | |
498 | |
499 | |
504 | |
515 | |
521 | |
522 | |
527 | |
528 | |
529 | |
537 | |
569 | |
591 | |
597 | |
611 | |
615 | |
642 | |
Other editions - View all
Common terms and phrases
abutment adit anchor bars arch Axis backfill BLOCK blockout bolts breakers BUREAU OF RECLAMATION cable cableway cantilever circuit circuit breakers COLORADO RIVER STORAGE construction Contraction joint contractor cooling crane DENVER Detail diversion tunnel downstream face draft tube drain drilled electrical equipment excavation Expansion joint factor of safety floor foundation Furnishing and installing gallery GLEN CANYON DAM grouting hoist horizontal INTERIOR BUREAU Lake Powell lift load located Lump sum mass concrete maximum operation penstock Piezometer placed pounds per square powerplant pozzolan pressure PROJECT MIDDLE RIVER pump radial reading stations RECLAMATION COLORADO RIVER REFERENCE DRAWINGS reinforced reservoir reservoir water RIVER OUTLETS RIVER STORAGE PROJECT rock SANDSTONE seal SECTION A-A service bay shown on figure slab spillway square inch Std pipe steel STORAGE PROJECT MIDDLE stresses structure surface switchyard temperature transformer trashrack turbine UNIT BAY UNITED STATES DEPARTMENT valve vertical
Popular passages
Page 1 - Additional projects have been added since the original legislation was adopted. Authorized developments are: Glen Canyon unit on the Colorado River in Arizona and Utah, Flaming Gorge unit on the Green River in Utah and Wyoming, Navajo unit on the San Juan River in New Mexico and Colorado, and Curecanti unit, consisting of three dams on the Gdnnison River in Colorado.
Page 315 - Computation of time-and-onehalf for work in excess of 8 hours per day or 40 hours per week...
Page 1 - It has made possible a dream that persisted for decades — the taming of one of the longest, wildest, and most savage rivers in the country, the Colorado and its tributaries. The Colorado River storage project was planned to conserve the very limited precipitation which falls principally in the form of snow in the high mountains and to utilize it for municipal, industrial, and agricultural growth. The sum of...
Page 2 - River system between the upper basin and the lower basin and provides that the States of the upper division (Colorado, New Mexico, Utah, and Wyoming) will not cause the flow of the river at Lee Ferry to be depleted below an aggregate of 75,000,000 acre-feet for any period of 10 consecutive years. The compact also provides for a division of surplus waters...
Page 318 - Permits for the examination of ruins, the excavation of archeological sites, and the gathering of objects of antiquity will be granted, by the respective Secretaries having jurisdiction, to reputable museums, universities, colleges, or other recognized scientific or educational institutions, or to their duly authorized agents.
Page 318 - An Act for the preservation of historic American sites, buildings, objects, and antiquities of national significance, and for other purposes', approved August 21, 1935 (49 Stat.
Page 47 - The rock formations which make up the foundation and abutments at the site are homogeneous and uniformly elastic in all directions, and are strong enough to carry the applied loads with stresses well below the elastic limit. 2. The concrete in the dam is homogeneous and uniformly elastic in all directions and is strong enough to carry the applied loads with stresses well below the elastic limit.
Page 153 - Be manufactured in accordance with section VIII of the ASME Boiler and Pressure Vessel Code...
Page 295 - Standard Specifications for Highway Bridges of the American Association of State Highway Officials...