Figure 181.-Powerplant unit bays substructure sequence of construction placements 1 through 10Elevation 3093.0 to elevation 3125.08. Figure 182.-Powerplant unit bays 2 through 8 intermediate structure sequence of construction for placements 20 through 42-Elevation 3124.75 to elevation 3168.17. €13/25.08 REVISED DOOR OPENINGS AND PLACEMENTS 34 THRU 48. UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION COLORADO RIVER STORAGE PROJECT TRAGED.. CHECKEDUDA. RECOMMENDED. Wow. &. Wef. APPROVED omaltude. DENVER, COLORADO, JULY BO, ... 557-D-1009 -6-12 6" Galv. wil pipe Invert E. 3132 00 Min EI. 3168.17 EI. 3185.08 -12 Gal. Wi pipe vent Slope $ !! 6" Galv. W... pipe vent with coupling PLATFORM SCALE K EI 3169 17 6 Sedimentation tank influent EI 3178 20. CHLORINATOR Slope SLUDGE STORAGE Slope TANK (Below) 9. E1 317812 10x10 Blockout see 557-0-1939 6 Air inlet pipe -Frame Mk. 167-F4 24 Pit רן. E1 3178.20 Sludge pump L -2-3 Frame Mk. 167-F6 Weir ·EI.3180.00 3-0° -8-0 for location- Wall reinforcement not shown Dowel pattern from concrete below to match reinforeement in both columns SECTION B-B NOTES Pipe fittings, and valves shown by single line and equipment For general notes and reference drawings, see 40-D-5432&5433. For typical details of cover slab and waterproofing, see(1595) Clear cover over reinforcement shall be 3° for concrete Manhole rings and covers shall be cast iron slab type and equal shall be heavy duty, cover to be gasketed and secured with Inserts shall be equal to Series P-3200 concrete inserts as 62 ADDED REFERENCE DRAWING NOS 557-D-2196 82197 2-16 -62 557-0-167 557-0-2454 2455 D-EAR 5-10-61 0- BHR 1-19-61 R.S.S. ALWAYS THINK SAFETY DENVER, COLORADO, AUG 24, 1960 557-D-2195 Figure 184.-Powerplant sewage treatment plant. |