Figure 30.-Right diversion tunnel plug details-Plan, elevation, and sections. (Sheet 1 of 2.) requirements All grout tubing to be anchored securely before concrete Connect tubing across contraction joints with expension The embedded end of thermometer tubing to be flattened After tunnel plug has been placed, remove valve, close For details of grout outlets for contraction joint grouting, see Dwg. 40-D-5434. Cool and complete funnel plug grouting before placing Cool and complete grouting of backfill concrete before ZZZZZ Diversion tunnel lining. Plug and backfill concrete Spillway tunnel lining Figure 30.-Right diversion tunnel plug details-Plan, elevation, and sections. (Sheet 2 of 2.) SECTION F-F (2218) COOLING TUBING NOT SHOWN NOTE For general notes, concrete finishes, and explanation, see Dwg 557-0-2218. 1-20-43 DELETED PERIMETER GROUT MOLES UNITED STATES DEPARTMENT OF THE INTERIOR COLORADO RIVER STORAGE PROJECT MIDDLE RIVER DIV-GLEN CANYON UNIT-ARIZONA-UTAN GLEN CANYON DAM RIGHT DIVERSION TUNNEL-PLUG DETAILS DRAWN |