Technical Record of Design and Construction: Flaming Gorge Dam and Powerplant, Constructed 1958-1964, Colorado River Storage Project, Utah |
From inside the book
Results 1-5 of 65
Page
... protection , sediment retention , fish and wildlife conservation , and recreational opportunities are also provided . Approximately 95 percent of the costs of the Colorado River Storage project and partici- pating projects are ...
... protection , sediment retention , fish and wildlife conservation , and recreational opportunities are also provided . Approximately 95 percent of the costs of the Colorado River Storage project and partici- pating projects are ...
Page v
... protection B. Building Facilities Page 181 183 183 90 . Heating . 91 . Ventilation 92 . Cooling . 93 . Sewage ... protection water system . ( g ) Domestic and service water system ( h ) Unit cooling water systems . ( j ) Compressed air ...
... protection B. Building Facilities Page 181 183 183 90 . Heating . 91 . Ventilation 92 . Cooling . 93 . Sewage ... protection water system . ( g ) Domestic and service water system ( h ) Unit cooling water systems . ( j ) Compressed air ...
Page viii
... protection Grounding system 274 275 CHAPTER X. Design -- VISITORS ' CENTER AND SERVICE FACILITIES 135 . General . 136 . Service yard area 137 . Visitors ' center foundation 138 . Utility service tunnel . . 139 . Visitors ' parking area ...
... protection Grounding system 274 275 CHAPTER X. Design -- VISITORS ' CENTER AND SERVICE FACILITIES 135 . General . 136 . Service yard area 137 . Visitors ' center foundation 138 . Utility service tunnel . . 139 . Visitors ' parking area ...
Page xv
... protection 275 . Pumps 276 . Water level gages 277 . Piping systems 278 . 279 . 409 409 409 410 410 410 280 . 281 . ( a ) Powerplant ( b ) Switchyard . Machine tools Cleaning and painting metalwork . ( a ) Turbines ( b ) Penstock makeup ...
... protection 275 . Pumps 276 . Water level gages 277 . Piping systems 278 . 279 . 409 409 409 410 410 410 280 . 281 . ( a ) Powerplant ( b ) Switchyard . Machine tools Cleaning and painting metalwork . ( a ) Turbines ( b ) Penstock makeup ...
Page xix
... protection water system 127. Schematic piping diagram --Domestic and service water system . 128. Schematic piping diagram --Unit cooling water systems . . 129. Schematic piping diagram --Air compressor cooling water system . 130 ...
... protection water system 127. Schematic piping diagram --Domestic and service water system . 128. Schematic piping diagram --Unit cooling water systems . . 129. Schematic piping diagram --Air compressor cooling water system . 130 ...
Contents
1 | |
11 | |
29 | |
37 | |
38 | |
43 | |
55 | |
57 | |
73 | |
83 | |
86 | |
91 | |
97 | |
113 | |
115 | |
121 | |
129 | |
135 | |
143 | |
151 | |
163 | |
166 | |
173 | |
175 | |
180 | |
181 | |
183 | |
186 | |
190 | |
194 | |
199 | |
200 | |
210 | |
211 | |
212 | |
222 | |
231 | |
233 | |
297 | |
303 | |
306 | |
313 | |
320 | |
326 | |
337 | |
345 | |
349 | |
352 | |
356 | |
362 | |
366 | |
369 | |
376 | |
382 | |
383 | |
389 | |
396 | |
399 | |
406 | |
410 | |
427 | |
431 | |
433 | |
439 | |
446 | |
472 | |
501 | |
Other editions - View all
Common terms and phrases
Adit anchor bars arch blockout BUREAU OF RECLAMATION cable cantilever COLORADO RIVER STORAGE concrete Conduit construction Contraction joint crane crest DENVER designed DETAIL diversion tunnel downstream face drain drainage basin drainage holes drilled Elevator tower excavation expansion joint face of dam feet Figure Filling line FLAMING GORGE DAM FOUNDATION GALLERY GORGE UNIT Green River grouting header hoist structure hollow-jet valve horizontal installed INTERIOR BUREAU load located maximum operation outlet pipes Penstock piston PLAN plone pounds per square powerplant PROJECT GREEN DIV-FLAMING pumps reading station RECLAMATION COLORADO RIVER REFERENCE DRAWINGS reinforcement relief valve reservoir reservoir water resistance thermometers river outlets RIVER STORAGE PROJECT rock rubber joint filler seal SECTION A-A shale shale zones shown Slope spillway Sponge rubber joint square inch steel STORAGE PROJECT GREEN strain meter strainmeters stresses surface switchyard temperature thermometer trashrack structure tubing UNITED STATES DEPARTMENT upstream face vent vertical
Popular passages
Page 181 - I bars so placed that more than 12 inches of concrete is cast in the member below the bar. In case of uncertainties regarding classification of horizontal bars, use bond stress for top bars. * Deformations for high-bond bars shall conform to the requirements of ASTM Designation A. 305(latest edition) '"n 15 12 10 8
Page 181 - REINFORCEMENT k 0.40 0.40 0.40 0.40 ^R 157 196 235 294 WORKING STRESSES FOR REINFORCEMENT Tension in flexural members with or without axial loads. Intermediate and hard-grade steel f, 20,000 Tension in *eb reinforcement Intermediate grade steel f s 16,000 Compression in column verticals and flexural members (Intermediate grade steel)
Page 333 - the type and size or capacity of a particular make and model of equipment were not stated in the original report, these have been obtained from current construction equipment catalogs. As specifications for a particular model may vary from year to year, some minor discrepancies may exist between the reported size or capacity and that of the equipment actually used.
Page 437 - Where the type and size or capacity of a particular make and model of equipment were not stated in the original report, these have been obtained from current construction equipment catalogs. As specifications for a particular model may vary from year to year, some minor discrepancies may exist between the reported size or capacity and that of the equipment actually used.
Page 404 - _l/Where the type and size or capacity of a particular make and model of equipment were not stated in the original report, these have been obtained from current construction equipment catalogs. As specifications for a particular model may vary from year to year, some minor discrepancies may exist between the reported size or capacity and that of the equipment actually used.
Page 230 - combinations of these stresses were increased according to the Navy standard noted. A factor of safety of not less than 5, based on the ultimate strength of the material and rated capacity of the crane, was used in the design of all mechanical parts.
Page 99 - pounds per square inch. Equivalent stress in the skinplate due to beam bending and skinplate bending was limited to 20,000 pounds per square inch. A portion of the skinplate was considered to be an integral part of the upstream beam flanges. The skinplate was also assumed to act as a haunched continuous beam with the supports on the
Page 134 - Material Steel Bolt steel Cast steel Brass or bronze Type Rolled or forged Rolled or forged Castings Rolled or cast Percent of yield point 40 25 33 33 Percent of ultimate strength 25 16.5 20