Technical Record of Design and Construction: Flaming Gorge Dam and Powerplant, Constructed 1958-1964, Colorado River Storage Project, Utah |
From inside the book
Results 1-5 of 100
Page xiii
... plant • 385 Aggregate processing plant 244 . 245 . ( a ) Storage of cement and pozzolan ( b ) Storage of aggregates . . ( c ) Finish screening of coarse aggregates ( d ) Mixing water . ( e ) Batching of concrete ingredients ( f ) Mixing ...
... plant • 385 Aggregate processing plant 244 . 245 . ( a ) Storage of cement and pozzolan ( b ) Storage of aggregates . . ( c ) Finish screening of coarse aggregates ( d ) Mixing water . ( e ) Batching of concrete ingredients ( f ) Mixing ...
Page xiv
... plant for powerplant 257. Concrete plant for switchyard 258. Concrete placements . 398 • 399 399 3. Heating , Ventilating , and Air Conditioning 259. Introduction 260 . • Installation . 399 399 261 . Introduction 4. Turbines ( a ) ...
... plant for powerplant 257. Concrete plant for switchyard 258. Concrete placements . 398 • 399 399 3. Heating , Ventilating , and Air Conditioning 259. Introduction 260 . • Installation . 399 399 261 . Introduction 4. Turbines ( a ) ...
Page 27
... . --5600 DRAWN- . TRAGED .. -BUBMITTED & R. & ubult RECOMMENDED ... R.J . Lynn .... CHECKED REC . APPROVED PERSON CAREER DENVER , COLORADO , AUGUST 9 , 1963. 591 - D - 1364 To Power Plant , Government Comp , and Linwood , 27.
... . --5600 DRAWN- . TRAGED .. -BUBMITTED & R. & ubult RECOMMENDED ... R.J . Lynn .... CHECKED REC . APPROVED PERSON CAREER DENVER , COLORADO , AUGUST 9 , 1963. 591 - D - 1364 To Power Plant , Government Comp , and Linwood , 27.
Page 30
... PLANT TRAGED PLAN , ELEVATION , AND SECTIONS BURMITTED ... RECOMMENDED 7mins ONEOKED JR . 77. ExelRUED .. DENVER , COLORADO , Acting 591-0-142 100 100 PT . Sta 5 + 18.51 S : 0.01 SCALE OF FEET E15607.97 Sta 7 + 37.50 EL 5605.78 End of ...
... PLANT TRAGED PLAN , ELEVATION , AND SECTIONS BURMITTED ... RECOMMENDED 7mins ONEOKED JR . 77. ExelRUED .. DENVER , COLORADO , Acting 591-0-142 100 100 PT . Sta 5 + 18.51 S : 0.01 SCALE OF FEET E15607.97 Sta 7 + 37.50 EL 5605.78 End of ...
Page 46
... plant . Initially , this temperature benefit was to have been applied only for placement lifts within 15 feet of the foundation or abutment rock , but it was later extended to all mass concrete placed in the dam during the months of ...
... plant . Initially , this temperature benefit was to have been applied only for placement lifts within 15 feet of the foundation or abutment rock , but it was later extended to all mass concrete placed in the dam during the months of ...
Contents
1 | |
11 | |
29 | |
37 | |
38 | |
43 | |
55 | |
57 | |
73 | |
83 | |
86 | |
91 | |
97 | |
113 | |
115 | |
121 | |
129 | |
135 | |
143 | |
151 | |
163 | |
166 | |
173 | |
175 | |
180 | |
181 | |
183 | |
186 | |
190 | |
194 | |
199 | |
200 | |
210 | |
211 | |
212 | |
222 | |
231 | |
233 | |
297 | |
303 | |
306 | |
313 | |
320 | |
326 | |
337 | |
345 | |
349 | |
352 | |
356 | |
362 | |
366 | |
369 | |
376 | |
382 | |
383 | |
389 | |
396 | |
399 | |
406 | |
410 | |
427 | |
431 | |
433 | |
439 | |
446 | |
472 | |
501 | |
Other editions - View all
Common terms and phrases
Adit anchor bars arch blockout BUREAU OF RECLAMATION cable cantilever COLORADO RIVER STORAGE concrete Conduit construction Contraction joint crane crest DENVER designed DETAIL diversion tunnel downstream face drain drainage basin drainage holes drilled Elevator tower excavation expansion joint face of dam feet Figure Filling line FLAMING GORGE DAM FOUNDATION GALLERY GORGE UNIT Green River grouting header hoist structure hollow-jet valve horizontal installed INTERIOR BUREAU load located maximum operation outlet pipes Penstock piston PLAN plone pounds per square powerplant PROJECT GREEN DIV-FLAMING pumps reading station RECLAMATION COLORADO RIVER REFERENCE DRAWINGS reinforcement relief valve reservoir reservoir water resistance thermometers river outlets RIVER STORAGE PROJECT rock rubber joint filler seal SECTION A-A shale shale zones shown Slope spillway Sponge rubber joint square inch steel STORAGE PROJECT GREEN strain meter strainmeters stresses surface switchyard temperature thermometer trashrack structure tubing UNITED STATES DEPARTMENT upstream face vent vertical
Popular passages
Page 181 - I bars so placed that more than 12 inches of concrete is cast in the member below the bar. In case of uncertainties regarding classification of horizontal bars, use bond stress for top bars. * Deformations for high-bond bars shall conform to the requirements of ASTM Designation A. 305(latest edition) '"n 15 12 10 8
Page 181 - REINFORCEMENT k 0.40 0.40 0.40 0.40 ^R 157 196 235 294 WORKING STRESSES FOR REINFORCEMENT Tension in flexural members with or without axial loads. Intermediate and hard-grade steel f, 20,000 Tension in *eb reinforcement Intermediate grade steel f s 16,000 Compression in column verticals and flexural members (Intermediate grade steel)
Page 333 - the type and size or capacity of a particular make and model of equipment were not stated in the original report, these have been obtained from current construction equipment catalogs. As specifications for a particular model may vary from year to year, some minor discrepancies may exist between the reported size or capacity and that of the equipment actually used.
Page 437 - Where the type and size or capacity of a particular make and model of equipment were not stated in the original report, these have been obtained from current construction equipment catalogs. As specifications for a particular model may vary from year to year, some minor discrepancies may exist between the reported size or capacity and that of the equipment actually used.
Page 404 - _l/Where the type and size or capacity of a particular make and model of equipment were not stated in the original report, these have been obtained from current construction equipment catalogs. As specifications for a particular model may vary from year to year, some minor discrepancies may exist between the reported size or capacity and that of the equipment actually used.
Page 230 - combinations of these stresses were increased according to the Navy standard noted. A factor of safety of not less than 5, based on the ultimate strength of the material and rated capacity of the crane, was used in the design of all mechanical parts.
Page 99 - pounds per square inch. Equivalent stress in the skinplate due to beam bending and skinplate bending was limited to 20,000 pounds per square inch. A portion of the skinplate was considered to be an integral part of the upstream beam flanges. The skinplate was also assumed to act as a haunched continuous beam with the supports on the
Page 134 - Material Steel Bolt steel Cast steel Brass or bronze Type Rolled or forged Rolled or forged Castings Rolled or cast Percent of yield point 40 25 33 33 Percent of ultimate strength 25 16.5 20