Page images
PDF
EPUB
[graphic][merged small]

Frontispiece. --Flaming Gorge Dam and Switchyard. P591-421-6209A, July 1966.

FOREWORD

Technical records of design and construction are a series of publications which

record the planning, design, construction, and initial operation of Bureau of Reclamation

structures.

This technical record of design and construction for Flaming Gorge Dam and Powerplant is divided into three parts. Part I is devoted to general planning, historical information, a description of the features, a summary of costs, foundation treatment, and geology. Part II contains seven chapters covering the design of the various features and their components. Part III contains one chapter on contract administration and five

chapters comprising a concise narration of construction operations and equipment

installations.

This technical record was prepared by the Technical and Foreign Services Branch of the Office of Chief Engineer in Denver, Colo., from final design reports submitted by the design branches, final construction reports and cost information submitted by the field offices, and various planning reports. Acknowledgment is gratefully made to the designers and field personnel for their contributions to this work.

There are occasional references to proprietary materials or products in this technical record. These must not be construed in any way as an endorsement, as the Bureau cannot endorse proprietary products or processes of manufacturers or the services of commercial firms for advertising, publicity, sales, or other purposes.

« PreviousContinue »