pamphlets should be on letter-size paper with a heavier paper binding cover. The date of original preparation and the date of each successive revision if any, should be shown, preferably on the outside cover. The pamphlet should contain only slight reference to prospective improvements where those improvements have not yet been authorized by Congress.

(b) Two copies of each information pamphlet on river and harbor and flood control projects shall be furnished each Division Engineer direct for his files. Upon receipt of information pamphlets Division Engineers should ascertain the number of additional copies needed for offices in their division, and obtain the necessary copies from the districts issuing them by direct correspondence. (c) Fifty copies of each new or revised pamphlet shall be furnished the Chief of Engineers.

PHOTOGRAPHS

295. To be submitted at least every 3 months.--District Engineers shall submit in duplicate at least every 3 months photographs of construction projects (both new work and maintenance) in their charge, which are capable of photographic representation. For fortification photography requirements, see Chap. IV. 295.1. Character.-Photographs should show the general features of the works, and when practicable, any particularly interesting details or details believed to be peculiar to the special work or to the district. Photographs of locks and dams constructed by the Corps of Engineers, breakwaters, flood control structures, bank revetments, wing dams, and other typical works are particularly desired. Characteristic navigation scenes on improved harbors, rivers, or other navigable channels, and photographs of floating and other major items of plant are desired, but such photographs as these need be submitted only as occasion may warrant.

295.2. Point of view.-When taking progress photographs the point of view should be carefully selected so that the same, or substantially the same, point of view and direction may be used from time to time to show the progress made between the intervals when the photographs are taken.

295.3. Size and marking.—All general progress photographs shall be of a uniform size, 8 x 10 inches, with a one-inch additional margin at the left for binding. A brief description of the photograph will be placed on the face of each print a space one inch wide along the bottom, the entire length of the ten-inch dimension, being reserved therefor. The description will include: date taken, serial number, name and location of district, whether the work accomplished by Government plant and hired labor or by contract. If by contract show contractor's name, contract number, and contract date. If necessary, any additional description may be placed on the back. Projects should be identified by source of funds under which the work is being done, such as river and harbor, flood control, fortification, Public Works Administration, Work Projects Administration, or other source.

295.4. Mounting.--All photographs shall be mounted on linen backing. If for any reason, linen-back paper is not available, the following procedure should be helpful in providing satisfactory glossy prints. After fixing and washing, prints should be placed face down on thin sheet iron enameled to a high gloss, or on chromium-plated ferro-type plates. These plates are then passed through a wringer roll to remove excess water and allowed to dry in a rack. The prints when taken from the plates should be rolled face outward in staggered position, in a paper roll over a cardboard tube about three inches in diameter. The prints should preferably remain in the paper roll over night

and then be removed the following morning. Reasonable care should be exercised thereafter in avoiding the proximity of heat or dampness.

295.5. Annual.-Also, apart from the foregoing, District Engineers on Novemher 1st of each year shall submit a set of typical photographs in quadruplicate of current river and harbor and flood control works in their districts. Each photograph will be 8" by 10" in size and unmounted. No typing should appear on the glossy face of these photographs. The description or caption should be on separate slip temporarily attached to back of photograph by sticker.

295.6. Mailing.-Photographs should be sent to the Office of the Chief of Engineers flat, without clips and unfolded, using the proper size of photographic mailing envelope, so as to prevent damage in the mails.

295.7. Motion picture.—A file is maintained in the Office of the Chief of Engineers of 16 mm. motion picture films showing typical activities of the Department, with particular reference to river and harbor and flood control operations. These films are available for loan for departmental engineering discussions as well as for civic conferences and meetings. It is desired that Division Engineers assure the furnishing from time to time of films of marked value for this purpose. Information regarding the availability of films for loan may be obtained from the Chief of Engineers.

295.8. Air Corps.-Request for aerial photography to be performed by the Air Corps shall be submitted to the Chief of Engineers (See C. L., R. & H. No. 47, 1938) and will except in cases of major disaster, include:

(a) A statement that no aerial photographs exist for the area in question or that the existing ones are unsuitable. In the latter case, the reasons for the unsuitability of the existing aerial photographs will be given.

(b) Maps, index map in triplicate, showing area to be photographed.

(c) Photographs, size desired.

(d) Camera, type, single-lens, 5-lens, etc.

(e) Scale.

(f) Overlap, forward, side.

(g) Prints, number desired and kind (glossy or mat, etc.). Negative, if desired.

(h) Project elevation, if not clearly shown on map.

(i) Period during which work is to be accomplished.

295.9. Special.-Instructions regarding the submission of special photographis such as floating plant under construction, panoramic views, negatives for making lantern slides, and other views, will be issued by the Chief of Engineers as occasion may require.

295.10. Mapping, non-military agencies.-For information regarding aerial mapping by non-military agencies of the Federal Government, see Chap. III. 295.11. Bridges.--For instructions regarding the submission of photographs of completed bridges, see Chap. V.

MILITARY SURVEYS

296. Cost.-Immediately on the completion of a survey, or of any sheet of a survey, by Engineer troops, a cost report shall be made on E. D. Form 217 to the Chief of Engineers. Every item of cost incident to the survey from its commencement to the completion of the field sheets will be included. No expenses incident to reproduction will be reported. Where the field sheets are drafted and lettered in such a way as to permit reproduction without redrafting, the cost of excess drafting not needed for the field sheets will be considered a reproduction charge and will not be included in the report. (A. R. 100-5).

[blocks in formation]
[blocks in formation]

Annual report---

Reports on_.

Blank forms, requisitions__.

Boards, reports of, submitted through Division Engineer_.

Boat yards:

Boiler inspections, correspondence re-.

210

210, 282, 291

274

276

211

[blocks in formation]

Bureau of Reclamation, notice to (preliminary examinations and surveys) – 279.2 Bureau, Foreign and Domestic Commerce, correspondence with....

211

[blocks in formation]

Civil Aeronautics Authority (preliminary examinations and surveys) ---- 279.2 Civil Service:

[blocks in formation]

Class of vessels using locks on rivers, monthly report___
Coal, correspondence with Bureau of Mines re purchase.
Coast and Geodetic Survey, data for

236

211

256

Correspondence with

211

« PreviousContinue »