Palisades Dam and Powerplant, Constructed 1951-1957, Palisades Project, Idaho: Technical Record of Design and Construction |
From inside the book
Results 1-5 of 100
Page ii
... Specifications design 84 B. Spillway Design 27 . Description 28 . Design capacity . 29 . Crest design . 30 . 31 . 32 . 85 85 85 Hydraulic design of tunnel Hydraulic model studies . Structural design . ( a ) General • ( b ) Inlet and ...
... Specifications design 84 B. Spillway Design 27 . Description 28 . Design capacity . 29 . Crest design . 30 . 31 . 32 . 85 85 85 Hydraulic design of tunnel Hydraulic model studies . Structural design . ( a ) General • ( b ) Inlet and ...
Page viii
... Specifications No. DC - 3586 -- Open - cut and tunnel excavation 249 ( a ) Summary of bids , award of contract , and execution of work . 249 132 . ( b ) Orders for changes and extra work orders . ( c ) Claims by contractor against the ...
... Specifications No. DC - 3586 -- Open - cut and tunnel excavation 249 ( a ) Summary of bids , award of contract , and execution of work . 249 132 . ( b ) Orders for changes and extra work orders . ( c ) Claims by contractor against the ...
Page ix
... ( Specifications No. DC - 3586 ) . ( b ) Prime contractor ( Specifications No. DC - 3675 ) . ( c ) Completion contractor ( Specifications No. DC - 4464 ) . D. Safety 255 255 • 255 • · 256 · 256 141. Government forces 142. Contractors ...
... ( Specifications No. DC - 3586 ) . ( b ) Prime contractor ( Specifications No. DC - 3675 ) . ( c ) Completion contractor ( Specifications No. DC - 4464 ) . D. Safety 255 255 • 255 • · 256 · 256 141. Government forces 142. Contractors ...
Page x
... ( Specifications No. DC - 3675 ) 150 . General 279 151 . Preparation of foundation 279 152 . Zone 1 material 279 ( a ) Construction methods 279 ( b ) Moisture control ( c ) Progress • 282 283 153 . Zone 2 material • 283 ( a ) Screening ...
... ( Specifications No. DC - 3675 ) 150 . General 279 151 . Preparation of foundation 279 152 . Zone 1 material 279 ( a ) Construction methods 279 ( b ) Moisture control ( c ) Progress • 282 283 153 . Zone 2 material • 283 ( a ) Screening ...
Page xii
... ( Specifications No. DC - 3586 ) Page 178 . Open - cut excavation 302 · 179 . Tunnel excavation 302 180 . Temporary construction substation 306 181 . 182 . Access roads , contractor's camp and plant facilities Construction equipment . 306 ...
... ( Specifications No. DC - 3586 ) Page 178 . Open - cut excavation 302 · 179 . Tunnel excavation 302 180 . Temporary construction substation 306 181 . 182 . Access roads , contractor's camp and plant facilities Construction equipment . 306 ...
Contents
1 | |
10 | |
11 | |
17 | |
44 | |
48 | |
50 | |
56 | |
262 | |
265 | |
279 | |
285 | |
288 | |
293 | |
294 | |
300 | |
58 | |
71 | |
78 | |
84 | |
91 | |
98 | |
115 | |
122 | |
128 | |
132 | |
138 | |
141 | |
148 | |
154 | |
159 | |
177 | |
189 | |
200 | |
208 | |
215 | |
217 | |
220 | |
227 | |
235 | |
241 | |
249 | |
254 | |
302 | |
311 | |
312 | |
317 | |
327 | |
331 | |
339 | |
345 | |
349 | |
355 | |
361 | |
382 | |
389 | |
397 | |
405 | |
412 | |
419 | |
422 | |
425 | |
428 | |
435 | |
441 | |
448 | |
454 | |
458 | |
487 | |
Common terms and phrases
acre-feet ALLUVIUM anchor bars ANCHOR BLOCK andesite axis Backfill bars Blockout borrow area BUREAU OF RECLAMATION butterfly valve channel concrete Construction joint control house Crest curves cutoff trench DENVER DETAIL discharge downstream elevation excavation expansion joint FACTOR OF SAFETY flood flow FORCE AREA ZONE foundation gravel Grout hoist hollow-jet valve inch inlet installed intake structure INTERIOR BUREAU KIPS left abutment load located maximum NORMAL FORCE AREA operation outlet pipe outlet tunnel Palisades Dam Palisades Reservoir penstock manifold percent piezometer plate pore pressure pounds per square power penstock power tunnel pump RECLAMATION PALISADES reinforcement reservoir reservoir water right abutment riprap rock sand SCALE OF FEET second-feet SECTION A-A silt slab slope spillway steel stilling basin stress TANGENTIAL FORCE AREA trashrack tubing turbine Unit wet weight UNITED STATES DEPARTMENT upstream wall water hammer water surface waterstop wet weight Zone zone 1 material
Popular passages
Page 169 - Design Codes and Data. - The following codes and design data were used: (1) "Recommended Practice and Standard Specifications for concrete and Reinforced Concrete, " Report of the Joint Committee on Standard Specifications (1940). (2) "Standard of Design for Concrete No. 3Yb (November 15, 1929), " US Navy Department, Bureau of Yards and Docks. (3)
Page 92 - Top bars are horizontal bars so placed that more than 12 inches of concrete is cast in the member below the bar. In case of uncertainties regarding classification of horizontal bars, use bond stress for top bars. * Deformations for high bond bars shall conform to the requirements of ASTMDesignation A.
Page 91 - The designs were based on the use of concrete having a compressive strength of 3,000 pounds per square inch at 28 days. A modular ratio of 10 was assumed. For unusual loading conditions, working stresses were permitted to exceed the allowable by 33 percent.
Page 128 - the 1943 edition of the API-ASME "Code for the Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 148 - As the valve is opened, water flows past the periphery of the needle in the shape of a cylindrical ring along the inside of the valve body. The splitters which support the needle cut this