... horizontal position and loaded by an unknown thickness of overlying strata . The overburden lying upon and above the right abutment consists of talus slope wash with local accumulations of windblown soil and landslide debris . It ...
... horizontal position and loaded by an unknown thickness of overlying strata . The overburden lying upon and above the right abutment consists of talus slope wash with local accumulations of windblown soil and landslide debris . It ...
Page 23
... horizontal if the abcissa and ordinate are plotted to the same scale . If the point of complete saturation occurred under an effec- tive normal stress of 300 pounds per square inch or less , U was first computed for △ equal to Va ...
... horizontal if the abcissa and ordinate are plotted to the same scale . If the point of complete saturation occurred under an effec- tive normal stress of 300 pounds per square inch or less , U was first computed for △ equal to Va ...
Page 36
... horizontal strata within the embankment . The analyses there- fore considered the failure circle in each case to be through only one type and condition of zone 1 material . Changes in strength and pore pressure assumptions alter the ...
... horizontal strata within the embankment . The analyses there- fore considered the failure circle in each case to be through only one type and condition of zone 1 material . Changes in strength and pore pressure assumptions alter the ...
Page 68
... horizontal or 30 ° from plane of walls . Grout around entrance pipe shall be sand - portland cement or Bentonite . Connect tubes from lowest foundation tips to gages and valves located highest on manifold panels in terminal welf ...
... horizontal or 30 ° from plane of walls . Grout around entrance pipe shall be sand - portland cement or Bentonite . Connect tubes from lowest foundation tips to gages and valves located highest on manifold panels in terminal welf ...
Page 84
... horizontal leg of the tunnel . The spillway terminated with an open concrete - lined channel 28 feet wide and 354 feet long . An unlined channel beyond the lined section was provided to re- turn flows to the river . The outlet works and ...
... horizontal leg of the tunnel . The spillway terminated with an open concrete - lined channel 28 feet wide and 354 feet long . An unlined channel beyond the lined section was provided to re- turn flows to the river . The outlet works and ...
Contents
1 | |
10 | |
11 | |
17 | |
44 | |
48 | |
50 | |
56 | |
262 | |
265 | |
279 | |
285 | |
288 | |
293 | |
294 | |
300 | |
58 | |
71 | |
78 | |
84 | |
91 | |
98 | |
115 | |
122 | |
128 | |
132 | |
138 | |
141 | |
148 | |
154 | |
159 | |
177 | |
189 | |
200 | |
208 | |
215 | |
217 | |
220 | |
227 | |
235 | |
241 | |
249 | |
254 | |
302 | |
311 | |
312 | |
317 | |
327 | |
331 | |
339 | |
345 | |
349 | |
355 | |
361 | |
382 | |
389 | |
397 | |
405 | |
412 | |
419 | |
422 | |
425 | |
428 | |
435 | |
441 | |
448 | |
454 | |
458 | |
487 | |
Common terms and phrases
acre-feet ALLUVIUM anchor bars ANCHOR BLOCK andesite axis Backfill bars Blockout borrow area BUREAU OF RECLAMATION butterfly valve channel concrete Construction joint control house Crest curves cutoff trench DENVER DETAIL discharge downstream elevation excavation expansion joint FACTOR OF SAFETY flood flow FORCE AREA ZONE foundation gravel Grout hoist hollow-jet valve inch inlet installed intake structure INTERIOR BUREAU KIPS left abutment load located maximum NORMAL FORCE AREA operation outlet pipe outlet tunnel Palisades Dam Palisades Reservoir penstock manifold percent piezometer plate pore pressure pounds per square power penstock power tunnel pump RECLAMATION PALISADES reinforcement reservoir reservoir water right abutment riprap rock sand SCALE OF FEET second-feet SECTION A-A silt slab slope spillway steel stilling basin stress TANGENTIAL FORCE AREA trashrack tubing turbine Unit wet weight UNITED STATES DEPARTMENT upstream wall water hammer water surface waterstop wet weight Zone zone 1 material
Popular passages
Page 169 - Design Codes and Data. - The following codes and design data were used: (1) "Recommended Practice and Standard Specifications for concrete and Reinforced Concrete, " Report of the Joint Committee on Standard Specifications (1940). (2) "Standard of Design for Concrete No. 3Yb (November 15, 1929), " US Navy Department, Bureau of Yards and Docks. (3)
Page 92 - Top bars are horizontal bars so placed that more than 12 inches of concrete is cast in the member below the bar. In case of uncertainties regarding classification of horizontal bars, use bond stress for top bars. * Deformations for high bond bars shall conform to the requirements of ASTMDesignation A.
Page 91 - The designs were based on the use of concrete having a compressive strength of 3,000 pounds per square inch at 28 days. A modular ratio of 10 was assumed. For unusual loading conditions, working stresses were permitted to exceed the allowable by 33 percent.
Page 128 - the 1943 edition of the API-ASME "Code for the Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 148 - As the valve is opened, water flows past the periphery of the needle in the shape of a cylindrical ring along the inside of the valve body. The splitters which support the needle cut this