Page images
PDF
EPUB
[blocks in formation]

29.

Palisades Dam, determination of safety factor--Circle III.

44

[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]
[blocks in formation]
[merged small][ocr errors]

Palisades Dam, typical gradation curves --Zone 3
Palisades Dam, moisture control curves

55

57

[merged small][merged small][ocr errors]

Palisades Dam--Piezometer, embankment settlement, and
surface settlement installations .

67

68

69

Embankment vertical movement device

43.

Spillway design flood hydrograph--Snake River at
Palisades Dam site

5-, 10-, 25-, and 50-year flood hydrographs for
diversion requirements

133

73

74

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors]

62.

Power penstock manifold anchor block--Top plan and sections

110

[merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors]

67.

68.

69.

Operating instructions for 96-inch hollow-jet valve
Recommended design for 7.5- by 9.0-foot regulating slide
gate --Coefficient of discharge versus gate opening
Palisades Dam outlet works --Flow net at tunnel inlet

116

[ocr errors]

118

120

70.

Palisades Dam outlet works intake structure--Arch design
layout, loading and stresses

126

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

LIST OF FIGURES (Continued)

Title

Page

Figure

80.

19.67 by 28.03-foot fixed-wheel gate for outlet and power
tunnels --General installation

149

81.

Installation assembly for 19.67- by 28.03-foot fixed-wheel
gate hoist for outlet and power tunnels .

151

82.

Operating instructions for 19.67- by 28. 03-foot fixed-wheel
gate hoist for outlet and power tunnels

152

[blocks in formation]

95.

Palisades Powerplant, general arrangement--Longitudinal
section through centerline of units and plans at elevation
5410.00 and elevation 5421.00

173

174

[blocks in formation]

97.

Palisades Power plant architectural treatment --West, north,
and south elevations and details ..

176

98.

The construction of the outside face of the brickwork on the
c-line wall between the 3- and the 7- and 8-line of the
powerhouse

177

178

[blocks in formation]

180

100.

Palisades Powerplant --Expansion joint details .

181

101. Palisades Powerplant --Additional expansion joint details

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

121.

Palisades Dam, electrical installation --Single-line diagram.

230

[blocks in formation]
[blocks in formation]

129.

Palisades switchyard, 12.5-kilovolt switchyard V--Sections.

243

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

146.

Upstream ends of tunnel portals after completion of open-cut
excavation and prior to starting drilling of the tunnel sections

303

147.

View looking into power tunnel during period of inactivity
July 28 to 30, 1952

303

148.

A time-saving template in use for finding high spots of rock
over overbreak in the power and outlet tunnels

305

« PreviousContinue »