Flood Control Bill of 1946: Hearings Before the Committee on Flood Control, House of Representatives, 79th Congress, 2d Session, on H. R. 6597, a Bill Authorizing the Construction of Certain Public Works on Rivers and Harbors for Flood Control, and for Other Purposes; Apr. 8-19, and May 2, 3, and 14, 1946 |
From inside the book
Results 1-5 of 100
Page 24
... miles to Allentown , and then 16 miles northeasterly to enter the Delaware River at Easton . The drainage area comprises 1,370 square miles . The basin had a population of 393,000 in 1940 , nearly half of which was concentrated in the ...
... miles to Allentown , and then 16 miles northeasterly to enter the Delaware River at Easton . The drainage area comprises 1,370 square miles . The basin had a population of 393,000 in 1940 , nearly half of which was concentrated in the ...
Page 26
... miles to White Haven , thence southeasterly 54 miles to Allentown and thence 16 miles northeasterly to enter the Delaware River at Easton , Pa . The drainage area of 1,370 square miles embraces portions of nine counties in northeastern ...
... miles to White Haven , thence southeasterly 54 miles to Allentown and thence 16 miles northeasterly to enter the Delaware River at Easton , Pa . The drainage area of 1,370 square miles embraces portions of nine counties in northeastern ...
Page 27
... miles ; Aquashicola Creek , 81.2 square miles ; Pohopoco Creek , 111.7 square miles ; and Tobyhanna Creek , 128.3 square miles . The basin had a popula- tion of 393,000 in 1940 , nearly half of which was concentrated in the three ...
... miles ; Aquashicola Creek , 81.2 square miles ; Pohopoco Creek , 111.7 square miles ; and Tobyhanna Creek , 128.3 square miles . The basin had a popula- tion of 393,000 in 1940 , nearly half of which was concentrated in the three ...
Page 46
... miles in a southeasterly direction to its mouth at Chesapeake Bay . It lies in three physiographic regions - the ... miles up the Rappahannock River to the vicinity of Kelleys Ford and 33 miles up the Rapidan River to the vicinity of ...
... miles in a southeasterly direction to its mouth at Chesapeake Bay . It lies in three physiographic regions - the ... miles up the Rappahannock River to the vicinity of Kelleys Ford and 33 miles up the Rapidan River to the vicinity of ...
Page 49
... miles which en- ters at mile 123 ; Mountain Run , with a drainage area of 93 square miles which enters at mile 136 ; and Hazel River , with a drainage area of 352 square miles which enters at mile 145. Robertson River , also known as ...
... miles which en- ters at mile 123 ; Mountain Run , with a drainage area of 93 square miles which enters at mile 136 ; and Hazel River , with a drainage area of 352 square miles which enters at mile 145. Robertson River , also known as ...
Contents
1 | |
13 | |
20 | |
43 | |
78 | |
96 | |
106 | |
124 | |
365 | |
402 | |
468 | |
486 | |
502 | |
537 | |
559 | |
570 | |
134 | |
136 | |
148 | |
150 | |
188 | |
206 | |
207 | |
214 | |
262 | |
269 | |
576 | |
584 | |
593 | |
618 | |
642 | |
645 | |
661 | |
672 | |
684 | |
688 | |
Other editions - View all
Common terms and phrases
acre-feet acres additional ALLEN Allentown approved April Army engineers authorized average annual Barren County Bayou Bayou Macon benefits Board of Engineers canal CHAIRMAN channel Chief of Engineers CLASON Clinton River Colonel HERB Colonel SCHEIDENHELM Colonel WEST Congress consideration construction County Covington CRAWFORD cubic feet Desha County district engineer division engineer Engineers for Rivers estimated cost farm feet per second Flood Control Act Flood Control Committee flood damage flood protection flood-control project floodway flow Fredericksburg Gathright glad hearings highway improvement industrial interests Jackson River James River Lake land Lehigh River levee ment Mississippi River MOOMAW Mount Clemens Oakland County percent Potomac River present proposed railroad Rappahannock River recommended Red Run Representatives reservoir rights-of-way River Basin Rivers and Harbors Rossville Salem Church Savage River Secretary square miles statement stream submitted tion tributaries United Valley Vicksburg Virginia Washington watershed WHEELER
Popular passages
Page 164 - Interior, who shall transmit and dispose of such power and energy in such manner as to encourage the most widespread use thereof at the lowest possible rates to consumers consistent with sound business principles, the rate schedules to become effective upon confirmation and approval by the Federal Power Commission.
Page 622 - The practice, pleadings, forms, and modes of proceeding in civil causes, other than equity and admiralty causes in the Circuit and District Courts, shall conform, as near as may be, to the practice, pleadings, and forms and modes of proceeding, existing at the time in like causes in the courts of record of the State, within which such Circuit or District Courts are held, any rule of the court to the contrary notwithstanding.
Page 696 - That penstocks or other similar facilities adapted to possible future use in the development of hydroelectric power shall be installed in any dam herein authorized when approved by the Secretary of War upon the recommendation of the Chief of Engineers and of the Federal Power Commission...
Page 441 - That the Board of Engineers for Rivers and Harbors, created under Section 3 of the River and Harbor Act approved June 13, 1902, be, and is hereby requested to review the...
Page 24 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 173 - ... if the benefits to whomsoever they may accrue are in excess of the estimated costs, and if the lives and social security of people are otherwise adversely affected.
Page 173 - June 22, 1936, and to supplement the preliminary examinations and surveys which the Secretary of War has heretofore been authorized and directed to make of waterways with a view to the control of their floods, the Secretary of Agriculture be, and he is hereby, authorized and directed to cause preliminary examinations and surveys to be made for run-off and water-flow retardation and soilerosion prevention on the watersheds of said waterways, the costs thereof to be paid from appropriations heretofore...
Page 50 - Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
Page 662 - States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Page 34 - That hereafter no money appropriated under authority of this Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War...