Flood Control Bill of 1946: Hearings Before the Committee on Flood Control, House of Representatives, 79th Congress, 2d Session, on H. R. 6597, a Bill Authorizing the Construction of Certain Public Works on Rivers and Harbors for Flood Control, and for Other Purposes; Apr. 8-19, and May 2, 3, and 14, 1946 |
From inside the book
Results 1-5 of 8
Page 64
How far are you from Fredericksburg ? Mr. Brown. Twenty miles. The Chairman.
We are glad to have had your statement. Any other proponents or opponents of
this project present ? STATEMENT BY DONALD WALKER, CULPEPEE, VA.
How far are you from Fredericksburg ? Mr. Brown. Twenty miles. The Chairman.
We are glad to have had your statement. Any other proponents or opponents of
this project present ? STATEMENT BY DONALD WALKER, CULPEPEE, VA.
Page 444
Coon Rapids Dam is 8G6 miles above Cairo. Prairie du Rocher Creek and
Kaskaskia River enter the Mississippi River from the east at river miles 130 ami
118, respectively, above Cairo. The low area under consideration comprises
about 16 ...
Coon Rapids Dam is 8G6 miles above Cairo. Prairie du Rocher Creek and
Kaskaskia River enter the Mississippi River from the east at river miles 130 ami
118, respectively, above Cairo. The low area under consideration comprises
about 16 ...
Page 497
The Salinas River rises in the Coast Range mountains in San Luis Obispo
County , Calif . , and flows 168 miles northwesterly through San Luis Obispo and
Monterey Counties to Monterey Bay . The CHAIRMAN . What flood problem is
there ...
The Salinas River rises in the Coast Range mountains in San Luis Obispo
County , Calif . , and flows 168 miles northwesterly through San Luis Obispo and
Monterey Counties to Monterey Bay . The CHAIRMAN . What flood problem is
there ...
Page 506
The proposed plan of improvement consisting of correction and stabilization of
the lower 93 miles of the Salinas River and the lower 1 mile of its tributary Arroyo
Seco will not entail any alterations to bridges or other existing facilities. 3.
The proposed plan of improvement consisting of correction and stabilization of
the lower 93 miles of the Salinas River and the lower 1 mile of its tributary Arroyo
Seco will not entail any alterations to bridges or other existing facilities. 3.
Page 514
The levees of the Yazoo Basin have been strengthened by the addition of about
90 miles of seepage berms designed to guard against danger from sand boils .
After leaving Vicksburg , there are no levees on the east bank of the river above ...
The levees of the Yazoo Basin have been strengthened by the addition of about
90 miles of seepage berms designed to guard against danger from sand boils .
After leaving Vicksburg , there are no levees on the east bank of the river above ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Common terms and phrases
acres additional affected ALLEN amount annual appropriation approved Army engineers authorized average bank basin believe benefits Board building capacity caused CHAIRMAN channel Chief of Engineers Colonel HERB committee communities completed Congress conservation consideration construction cost County CRAWFORD Creek damage Department desire district district engineer drainage easements entire estimated existing fact farm favor Federal flood control flow follows Fredericksburg further give glad Government hearings House improvement increase industrial interests Jackson Lake land levee located lower matter mean miles Mississippi River necessary occurred Ohio operation percent plant present problem proposed questions railroad recommended record Representatives reservoir respect result River Salem Secretary statement stream submitted tion town tributaries understand United Valley Virginia Washington West WHEELER
Popular passages
Page 166 - Interior, who shall transmit and dispose of such power and energy in such manner as to encourage the most widespread use thereof at the lowest possible rates to consumers consistent with sound business principles, the rate schedules to become effective upon confirmation and approval by the Federal Power Commission.
Page 624 - The practice, pleadings, forms, and modes of proceeding in civil causes, other than equity and admiralty causes in the Circuit and District Courts, shall conform, as near as may be, to the practice, pleadings, and forms and modes of proceeding, existing at the time in like causes in the courts of record of the State, within which such Circuit or District Courts are held, any rule of the court to the contrary notwithstanding.
Page 698 - That penstocks or other similar facilities adapted to possible future use in the development of hydroelectric power shall be installed in any dam herein authorized when approved by the Secretary of War upon the recommendation of the Chief of Engineers and of the Federal Power Commission...
Page 443 - That the Board of Engineers for Rivers and Harbors, created under Section 3 of the River and Harbor Act approved June 13, 1902, be, and is hereby requested to review the...
Page 26 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 175 - ... if the benefits to whomsoever they may accrue are in excess of the estimated costs, and if the lives and social security of people are otherwise adversely affected.
Page 175 - June 22, 1936, and to supplement the preliminary examinations and surveys which the Secretary of War has heretofore been authorized and directed to make of waterways with a view to the control of their floods, the Secretary of Agriculture be, and he is hereby, authorized and directed to cause preliminary examinations and surveys to be made for run-off and water-flow retardation and soilerosion prevention on the watersheds of said waterways, the costs thereof to be paid from appropriations heretofore...
Page 52 - Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
Page 664 - States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Page 36 - That hereafter no money appropriated under authority of this Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War...