... relocations , and necessary replacements of existing facilities , including bridges , highways , sewers , including those storm sewers and drains required to convey interior drainage to improved channels or ponding areas , utilities ...
... relocations , and necessary replacements of existing facilities , including bridges , highways , sewers , including those storm sewers and drains required to convey interior drainage to improved channels or ponding areas , utilities ...
Page 271
... Relocations due to revised highway safety criteria ; $ 2,300,000 for increased protection against underseepage and erosion at the dam and Connecting Channel ; and $ 400,000 for Supervision and Admininistration based on reanalysis of ...
... Relocations due to revised highway safety criteria ; $ 2,300,000 for increased protection against underseepage and erosion at the dam and Connecting Channel ; and $ 400,000 for Supervision and Admininistration based on reanalysis of ...
Page 275
... Relocations Roads 33 miles with. Tocks Island Reservoir , Pa . , N.J. & N.Y. ( New Construction Start ) LOCATION : On Delaware River at Tocks Island , about 5 miles upstream from Delaware Water Gap and about 7 miles northeast of ...
... Relocations Roads 33 miles with. Tocks Island Reservoir , Pa . , N.J. & N.Y. ( New Construction Start ) LOCATION : On Delaware River at Tocks Island , about 5 miles upstream from Delaware Water Gap and about 7 miles northeast of ...
Page 291
... RELOCATION Mr. WHITTEN . Road relocations are estimated to cost $ 23.3 million . What is the plan for relocation of U.S. Route 209 , and what alterna- tives were considered in an effort to reduce the estimated cost ? You might supply ...
... RELOCATION Mr. WHITTEN . Road relocations are estimated to cost $ 23.3 million . What is the plan for relocation of U.S. Route 209 , and what alterna- tives were considered in an effort to reduce the estimated cost ? You might supply ...
Page 303
... relocations of buildings and other structures Beach nourishment for a period of 10 years Total $ 32,600,000 2,700,000 4,300,000 $ 39,600,000 Also , over $ 5,000,000 has been expended by local interests since 1938 , for limited beach ...
... relocations of buildings and other structures Beach nourishment for a period of 10 years Total $ 32,600,000 2,700,000 4,300,000 $ 39,600,000 Also , over $ 5,000,000 has been expended by local interests since 1938 , for limited beach ...
Other editions - View all
Common terms and phrases
30 June acre-feet Alabama River allocated in FY Allocation for FY Allocation FY 1971 Allocations to 30 APPROPRIATION TITLE Atchafalaya Basin Balance to Complete Bayou BENEFIT-COST RATIO budgetary reserve Canal Cash Contribution Colonel BANE COMPARISON OF FEDERAL Complete After FY CONSTRUCTION PROGRAM PB-1 cooperation Corps of Engineers Cost Allocations County Creek current Federal cost Delaware River drainage dredging Engineering and Design Estimated Federal Cost Estimated Non-Federal Cost Estimated Project Cost FEDERAL COST ESTIMATES feet FISCAL YEAR 1971 Hurricane Camille Illinois Waterway increase interests Lake Lands and Damages levees Louisiana maintenance miles Mississippi River navigation operation Pending Adjustments placed in budgetary Preconstruction Planning PROJECT COST ESTIMATE Region Relocations Reservoir River Basin South Atlantic SUMMARIZED FINANCIAL DATA SUMMARY CONSTRUCTION PROGRAM Supervision and Administration Tocks Island Tombigbee River TOTAL APPLIED COST Total Estimated Project TOTAL OBLIGATIONS TOTAL PROJECT COST Tributaries Undelivered Orders Undistributed Cost water supply Waterway WHITTEN