Multi-stage Production Planning and Inventory ControlSven Axsäter, Christoph A. Schneeweiss, Edward Allen Silver |
Contents
Some Modelling Theoretic Remarks on MultiStage Production Planning | 1 |
Overview of a Stock Allocation Model for a TwoEchelon Push System | 44 |
A Branch and Bound Algorithm for the Multi Item Single Level | 92 |
Copyright | |
7 other sections not shown
Other editions - View all
Multi-Stage Production Planning and Inventory Control Sven Axsäter,Christoph Schneeweiss,Edward Silver No preview available - 2014 |
Common terms and phrases
aggregate LP-model aggregate planning aggregate production plan algorithm allocation Assembly Systems assume backordering batch branch and bound capacitated capacity component computational considered constraints cost parameters cost structure cycle decision problem delivery interval determined disaggregation distribution Doetinchem downstream stage dynamic ech1 ech2 ech2a ech3 echelon inventory position fill rate forecast FTBO hierarchical production planning holding costs intermediate inventory inventory control iteration Katholieke Universiteit Leuven leadtime linear program lot-sizing problem Management Science material requirements planning month Muckstadt multi-echelon multi-stage lot-sizing natural order period node one-stage Operations Research optimal policy optimal solution order point ordering policy planning horizon planning level planning period product family product structure production smoothing model Production/Inventory reorder intervals requirements rolling horizon safety stock seasonal stock sequencing and scheduling service level setup cost shortage costs simulation solved stock level stocknorms stockpoint storage area subperiod Table two-echelon University of Mannheim upstream stage variable window length