State W. P. A. projects, approved by the President under the Emergency Relief Administration Act of 1939, from July 1, 1939, to Apr. 3, 1940, for flood control (revised through Apr. 3, 1940) Improve brook, between Providence and Cross Sts. 10, 693 State W. P. A. projects, approved by the President under the Emergency Relief Administration Act of 1939, from July 1, 1939, to Apr. 3, 1940, or flood control (revised through Apr. 3, 1940)-Continued Approved to operate in Mississippi and Tennessee. Flood-control projects, approved by the President under the Emergency Relief Appropriation Acts of 1937 and 1938, for operation by the War Department, Corps of Engineers, from Apr. 1, 1938, to Mar. 31, 1940 (Revised through Apr. 3, 1940) 1 From Treasury SF-1 reports. Flood-control proiects, approved by the President under the Emergency Relief Appropriation Act of 1937, from July 1, 1937, to Mar. 31, 1938, for which supplementary approvals were made from Apr. 1 to June 30, 1938, for operation by the War Department, Corps of Engineers (revised through Apr. 3, 1940) Official project No. County Type of work State 1 From Treasury SF-1 reports. * Supplementary approval. |