TABLE D-2. Vicksburg district-Continued [Bank protection works built during fiscal year and operative protection in place June 30, 1955] Mounds, Miss.. Riverton, Miss. do. 3,800 11, 140 12, 500 AC, A. AO, W, 1 Operative length according to latest surveys. Does not include 10,899 linear feet of pile dikes. • Constructed under appropriations for Rivers and Harbors. Report thereon included in Annual Report for work under the Little Rock district. * Does not include 375 linear feet of pile dikes. Note. 3 Constructed under sec. 9, Flood Control Act approved June 15, 1936. 4 Does not include 60,935 linear feet of pile dikes; 4,002 linear feet of triangular frame retards; 1,920 linear feet of asphalt groins; and 650 linear feet of spur levee dike, revetted end. concrete blocks; CS = con A asphalt; AC = articulated concrete; CB = crete slabs; FCM = flexible roll type concrete mats; MA mass asphalt; T = tetrahedrons; W = willow mattress; SC sacked sand cement. TABLE D-3. Memphis district [Bank protection works built during fiscal year and operative protection in place June 30, 1955] Westover, Ark. |