Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2U.S. Government Printing Office, 1938 - Harbors |
From inside the book
Results 1-5 of 99
Page 1049
... Rock and piles in gravel . Piles in gravel .. 100 1917 89 1,000 , 539. 26 Minn . Lock and dam No. 2 .. | 815. 2 1.3 miles above 110 500 12.2 15.9 15.0 Piles in sand , silt , and Hastings , Minn . 10 110 10 600 clay . Piles in sand ...
... Rock and piles in gravel . Piles in gravel .. 100 1917 89 1,000 , 539. 26 Minn . Lock and dam No. 2 .. | 815. 2 1.3 miles above 110 500 12.2 15.9 15.0 Piles in sand , silt , and Hastings , Minn . 10 110 10 600 clay . Piles in sand ...
Page 1050
... Rock . Rock . ( 13 100 1938 erton , Mo. 14.99 13.100 Lock and dam No. 24 . 273.4 Clarksville , Mo. 110 600 15.0 19.0 12.0 Rock ; piles in sand . Piles in sand . 14 7 Lock and dam No. 25 .. 241.4 Cap Au Gris , Mo ... 110 600 15.0 19.0 ...
... Rock . Rock . ( 13 100 1938 erton , Mo. 14.99 13.100 Lock and dam No. 24 . 273.4 Clarksville , Mo. 110 600 15.0 19.0 12.0 Rock ; piles in sand . Piles in sand . 14 7 Lock and dam No. 25 .. 241.4 Cap Au Gris , Mo ... 110 600 15.0 19.0 ...
Page 1053
... Rock Island district , for lockkeepers ' dwell- ings and a garage - pumphouse , was 88 percent completed . Installa- tion of sewer , water , and electrification systems for lockkeepers ' dwellings with Government plant and hired labor ...
... Rock Island district , for lockkeepers ' dwell- ings and a garage - pumphouse , was 88 percent completed . Installa- tion of sewer , water , and electrification systems for lockkeepers ' dwellings with Government plant and hired labor ...
Page 1055
... ( Rock Island Dis- trict ) -Regular funds - New work - Lock and dam at Guttenberg , Iowa ( No. 10 ) .- A contract for ... Rock Island , Ill . ( No. 15 ) .- Work under the contract entered into January 18 , 1937 , for excavation and ...
... ( Rock Island Dis- trict ) -Regular funds - New work - Lock and dam at Guttenberg , Iowa ( No. 10 ) .- A contract for ... Rock Island , Ill . ( No. 15 ) .- Work under the contract entered into January 18 , 1937 , for excavation and ...
Page 1057
... rock and brush dikes adjacent to locks were carried on at a cost of $ 19,478.05 . A total of 208 snags and stumps was removed from Rock River above Sterling Dam by hired labor with Government plant under authority of section 3 , River ...
... rock and brush dikes adjacent to locks were carried on at a cost of $ 19,478.05 . A total of 208 snags and stumps was removed from Rock River above Sterling Dam by hired labor with Government plant under authority of section 3 , River ...
Other editions - View all
Common terms and phrases
accounts payable June accounts receivable Act approved June allotted from War Amount allotted appropriated to June approved July 19 available June 30 Balance available June balance June 30 Balance unexpended June breakwater Civil Appropriation Act Columbia River Condition at end Cong Cost and financial Cost of maintenance cost of permanent Creek Department Civil Appropriation dredging end of fiscal ending June 30 Exclusive of available expended in fiscal financial summary Cost fiscal year 1940 Fiscal year ending Flood Control Act Gross amount expended Harbor Act hired labor June 11 June 22 Lake levee liabilities June 30 locks and dams maintenance to June miles Minus accounts payable Missouri River Ohio River Operations and results Outstanding liabilities June payable June 30 pier profitably expended project dimensions regular funds results during fiscal riprap River and Harbor Sangamon River Total amount appropriated Total cost Total expended total expenditures Unexpended balance June unexpended June 30
Popular passages
Page 1826 - Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
Page 2033 - Federal investigations of watersheds and measures for run-off and waterflow retardation and soil erosion prevention on watersheds shall be under the jurisdiction of and shall be prosecuted by the Department of Agriculture under the direction of the Secretary of Agriculture, except as otherwise provided by Act of Congress...
Page 2006 - That penstocks or other similar facilities adapted to possible future use in the development of hydroelectric power shall be installed in any dam herein authorized when approved by the Secretary of War upon the recommendation of the Chief of Engineers and of the Federal Power Commission.
Page 2034 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 2034 - ... States, political subdivisions thereof, or other responsible local agencies, shall be granted and reimbursed, from such funds, sums equivalent to actual expenditures deemed reasonable by the Secretary of War and the Chief of Engineers and made by them in acquiring lands, easements, and rights-of-way for any dam and reservoir project, or any channel improvement or channel rectification project for flood control heretofore or herein authorized : Provided, That no reimbursement shall be made for...
Page 1399 - The, Flood Control Act of June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Ohio River Basin as set forth in House Flood Control Committee Document No.
Page 2033 - Notwithstanding any restrictions, limitations, or requirement of prior consent provided by any other Act, the Secretary of War is hereby authorized and directed to acquire in the name of the United States title to all lands, easements, and rights-of-way necessary for any dam and reservoir project or channel improvement or channel rectification project for flood control...
Page 1767 - The tidal range between mean lower low water and mean higher high water is about 1.8 feet and the extreme tidal range is about 4 feet.
Page 1587 - The harbor is located on the south shore of Lake Erie at the mouth of the Conneaut River, 73 miles easterly from Cleveland, Ohio.
Page 2033 - That: Hereafter Federal investigations and improvements of rivers and other waterways for flood control and allied purposes shall be under the jurisdiction of and shall be prosecuted by the War Department under the direction of the Secretary of War and supervision of the Chief of Engineers...