ARCHITECT-ENGINEERING WORK DONE UNDER CONTRACT AND BY CORPS OF ENGINEERS

Mr. TABER. Last year we were told that the architect-engineer contracts amounted to 13 percent of the work design. Can you tell us what the current figure is?

General CASSIDY. I will have to supply that information for the record.

Mr. TABER. Isn't that a pretty high figure for that sort of thing? General CASSIDY. Before I make a statement on that, I would like to see how that percentage was used last year, whether it is dollarwise or workwise. I would say it is about an average figure of the past

year.

Mr. TABER. There is another table on page 76. Will you place a table in the record similar to that? (The table referred to follows:)

[blocks in formation]

Mr. TABER. Will you be able to handle the increased workload contemplated by the 1962 budget without increasing your architectengineer contract?

General CASSIDY. Yes, sir.

Mr. TABER. Will you make some progress toward reducing it?

General CASSIDY. With this contemplated reorganization and the changing of workloads, I believe that we shall be able to reduce to some extent the amount now given to architects-engineers.

NEW STARTS IN 1960 AND 1961

Mr. TABER. Will you bring up to date the tables on pages 108 through 112 of the 1961 hearings?

General CASSIDY. Yes, sir.

(The tabulations referred to follow :)

[blocks in formation]

Intracoastal Waterway, Caloosahatchee River to Anclote River. Hawaii: Kahului Harbor..

42,000

41, 930

[blocks in formation]

Illinois:

137,000

(5)

[blocks in formation]

Mississippi: Pascagoula Harbor.

Missouri: Des Moines and Mississippi River Levee District No. 1..
Nebraska: Gering Valley..

New Mexico:

Rio Grande Floodway, Cochiti to Rio Puerco..

Two Rivers Reservoir.

New York:

Buttermilk Channel.

Hudson River, 32-foot channel to Albany.

New York Harbor-New Jersey pierhead line, New York and
New Jersey.

North Carolina:

300,000

[blocks in formation]

Ohio Street Bridge, Buffalo River.

[blocks in formation]
[blocks in formation]

Oregon: Columbia River local protection: Malheur River, Vale unit.

512,000

107, 724

[blocks in formation]

804,000 1,755,000 293, 000 1,211,000

1, 143, 384

21, 574 92,930

585, 653

801, 043

264, 654

1 All new starts for fiscal year 1960 were unbudgeted.

? The amounts reported were in each case started to be based on consideration of that project alone without reference to the overall civil works program or overall capability.

The amounts shown do not reflect reduction based on anticipated savings and slippages.
From appropriation for construction; excludes prior planning funds.

No funds obligated pending authorization.

Fiscal year 1961 unbudgeted new starts

Project

Estimated Capability Appropria- obligations, stated! tion 2 fiscal year 1961 3

Arizona: Gila River, Camelsback Reservoir site to Salt River......
Arkansas:

[blocks in formation]

Arkansas River and tributaries, other bank stabilization (only), Arkansas.

[blocks in formation]

Garland City, Red River.

200,000

200, 000

Millwood Reservoir.

2,000,000 + 20,000

[blocks in formation]

Florida: Intracoastal Waterway, Jacksonville to Miami (Fort

500,000

Pierce to Miami).

400,000

[blocks in formation]
[blocks in formation]

Oregon: Lower Columbia River improvement to existing works: (a) Rainier Drainage District.

[blocks in formation]

(b) Sauvie Island Drainage District.

188,000

[blocks in formation]
[blocks in formation]

1 The amounts reported were in each case stated to be based on consideration of that project alone without reference to the overall civil works program or overall capability.

2 The amounts shown do not reflect reductions based on anticipated savings and slippages.

3 From appropriation for construction; excludes prior planning funds.

4 Project not yet fully authorized.

[blocks in formation]

Use of architect-engineers on fiscal year 1961 new construction starts

Estimated earnings of architect-engineers by fiscal years

[graphic]

See footnotes at end of table, p. 87.

[graphic][subsumed]

Use of architect-engineers on fiscal year 1961 new construction starts-Continued

North Pacific division:

South Atlantic division:

Pantego and Cucklers Creek, N.C.

Southwestern division: