FISCAL YEAR 1962:

The requested amount of $9,600,000 will be applied to:

Continue acquisition of lands

$ 3,300,000
Continue relocations

4,012, 900
Initiate reservoir clearing

355,000
Continue earth embankment

534, 900
Initiate flood control outlet works & pwr Intake works 200,000
Initiate construction of power house

150.000
Continue turbines and generators

315,000
Initiate switchyard, accessory electrical equipment and
miscellaneous power plant equipment

105,000
Initiate and complete access road

44,800
Initiate and complete Brookeland levee

10,800
Initiation of establishment of sedim. & degrad. ranges 15,000
Engineering and Design

118,000
Supervision and Administration

438,600
Total

$ 9,600,000

Non-Federal Costs: Local interests are required to reimburse the Federal Government for water supply benefits
by contributing $3,000,000 toward the first cost of the project and an additional $10,000,000 at the rate
of $ 200,000 annually for a period of 50 years after completion of the project.

STATUS OF LOCAL COOPERATION: A formal contract with the Lower Neches Valley Authority embodying the assurances
of local cooperation was approved by the Secretary of the Army on 22 January 1957.

1 COST EST DHATR$157,400,000) sube le quede legal and cost 92,000 based on to ale to slow

COMPARISON OF FEDERAL COST ESTIMATES: The current federal cost estimate of $57,900,000 18 an lacrease of
$500,000 from the latest estimate ($57,400,000) submitted to Congress. The increase includes $1,350,000 due
to higher price levels, $198,000 due to get overrun of quantities and cost on completed work and awarded
contracts, $47,000 due to final negotiations on relocations contracts, and $92,000 based on detailed study of
requirement for recreation facilities. The increase is partially offset by decreases of $844,000 due to low
bid received, $256,000 due to more detailed engineering studies, and $87,000 due to remalysis of requirements
for engineering and design and supervision and administration.

[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed]
[graphic]

APPROPRIATION. HITLER er en eposer Projects Ry CONSTRUCTION PROGR

[ocr errors]
[ocr errors]
[graphic][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed]

Mr. BOLAND. I have no questions.

REHABILITATION, GALVESTON HARBOR AND CHANNEL We move to rehabilitation. Galveston Harbor and Channel, $650,000. We will insert pages 248 through 250 in the record at this point. (Pp. 248 through 250 of the justifications are as follows :)

« PreviousContinue »