Annual Report of the Chief of Engineers, U.S. Army, Volume 2, Part 1U.S. Government Printing Office, 1951 - Harbors |
From inside the book
Results 1-5 of 100
Page 1436
... Surveys for navigation , flood control , power , and navigation 2725 The Board of Engineers for Rivers and Harbors . 2727 The Beach Erosion Board .. 2731 California Debris Commission_ Mississippi River Commission_ 2735 2751 Waterways ...
... Surveys for navigation , flood control , power , and navigation 2725 The Board of Engineers for Rivers and Harbors . 2727 The Beach Erosion Board .. 2731 California Debris Commission_ Mississippi River Commission_ 2735 2751 Waterways ...
Page 1443
... surveys , and Government costs , $ 23 , 300,000 . 3. Existing dam , owned by Northern States Power Co. , is complete ... surveys , and contingencies , covering the original 9 - foot survey , and a total of $ 613 , 551. 44 has been ...
... surveys , and Government costs , $ 23 , 300,000 . 3. Existing dam , owned by Northern States Power Co. , is complete ... surveys , and contingencies , covering the original 9 - foot survey , and a total of $ 613 , 551. 44 has been ...
Page 1449
... surveys , etc. , was carried on at a cost of $ 14,490.89 . Investigations and reports on claims for damages as a result of operation of locks and dams were made at a cost of $ 5,204.22 . Sedimentation observations and surveys were made ...
... surveys , etc. , was carried on at a cost of $ 14,490.89 . Investigations and reports on claims for damages as a result of operation of locks and dams were made at a cost of $ 5,204.22 . Sedimentation observations and surveys were made ...
Page 1454
... surveys , etc. ( hired labor ) ( July 1950 to June 1951 ) : St. Paul district Rock Island district St. Louis district Total new work 9,050.00 26,000.00 2,000.00 Maintenance ( hired labor ) ( July 1950 to June 1951 ) : Channel ...
... surveys , etc. ( hired labor ) ( July 1950 to June 1951 ) : St. Paul district Rock Island district St. Louis district Total new work 9,050.00 26,000.00 2,000.00 Maintenance ( hired labor ) ( July 1950 to June 1951 ) : Channel ...
Page 1457
... surveys , and contingencies ( general ) . 1462 1463 5. Plant allotment 1464 18 . Flood control 6. The Sny Basin , Ill . 1465 7. Mississippi River at Can- ton , Mo. 1466 8. Red Rock Reservoir , Upper Mississippi River Basin , Iowa . 1467 ...
... surveys , and contingencies ( general ) . 1462 1463 5. Plant allotment 1464 18 . Flood control 6. The Sny Basin , Ill . 1465 7. Mississippi River at Can- ton , Mo. 1466 8. Red Rock Reservoir , Upper Mississippi River Basin , Iowa . 1467 ...
Other editions - View all
Common terms and phrases
1st sess 2d sess Accounts payable acre-feet additional amount needed Allegheny River Annual Report anticipated allotment breakwater bridge Chief of Engineers Committee resolution completion of existing Condition at end Cong construction Control Act approved Cost and financial Creek cubic yards dredging end of fiscal ending June 30 Estimated additional amount existing project feet deep feet wide financial summary 1946 fiscal year 1951 Fiscal year ending fiscal years prior Flood Control Act Harbor Act hired labor including fiscal July June 28 Lake Michigan latest published map levee Location locks and dams Los Angeles River low-water datum miles Missouri River mouth Ohio River Ohio River Basin Operations and results operations.-The balance unexpended percent complete pier plans and specifications profitably expended project depth project was authorized Proposed operations.-The balance Public Works Committee reservoir results during fiscal revetment riprap River and Harbor tion total cost Total to June tributaries turning basin United Wabash River
Popular passages
Page 2173 - Avenue to the navigation turning basin ; all generally in accordance with the plans of the district engineer, and with such modifications thereof as in the discretion of the Chief of Engineers may be advisable...
Page 1477 - June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Upper Mississippi River Basin described in Flood Control Committee Document No. 1, Seventy-fifth Congress, first session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 1887 - That the sum of $25,000,000 is hereby authorized to be appropriated as an emergency fund to be expended under the direction of the Secretary of the Army and the supervision of the Chief of Engineers...
Page 1814 - ... in navigable streams and tributaries thereof, when in the opinion of the Chief of Engineers such work is advisable in the interest of flood control: Provided, That not more than $100,000 shall be expended for this purpose for any single tributary from the appropriations for any one fiscal year.
Page 1666 - Hereafter, it shall be the duty of the Secretary of War to prescribe regulations for the use of storage allocated for flood control or navigation at all reservoirs constructed wholly or In part with Federal funds provided on the basis of such purposes, and the operation of any such project shall be In accordance with such regulations...
Page 1961 - Reservoirs; subject to the condition that for each local flood-protection project, no expenditures will be made until local interests give assurances satisfactory to the Secretary of the Army that they will (a) provide without cost to the United States all lands, easements, and rightsof-way necessary for the construction of the project; (6) hold and save the United States free from damages...
Page 1930 - The reservoir will have a total storage capacity of 294,800 acre-feet. The reservoir will be operated as a unit of a coordinated reservoir system for flood protection in the east fork of the Little Miami River and the Ohio River Valleys and will also provide recreational opportunities.
Page 1565 - The general comprehensive plan for flood control and other purposes in the Missouri River Basin approved by the Act of June 28, 1938...
Page 1509 - The improvement is subject to the conditions that local interests make a cash contribution of $40,000 toward the construction cost, and give assurances satisfactory to the Secretary of War that they will provide, without cost to the United States, all lands, easements, and rights-of-way necessary for the construction of the project...
Page 1700 - States, or municipalities ; and provided further, that in case high dams are built before the United States shall have built the projected locks and low dams which are to be replaced, the United States shall contribute to the cost of the substituted structures an amount equal to the estimated cost of the work of navigation for which substitution is made.