Annual Report of the Chief of Engineers, U.S. Army, Volume 2, Part 1U.S. Government Printing Office, 1951 - Harbors |
From inside the book
Results 1-5 of 100
Page 1963
... Breakwaters and dredging of anchorage area of 26 acres to 16 feet . Sea walls across ledge in the southeast corner of the harbor , enlarging the anchorage basin and deepen- ing of entrance . Small boat basin with breakwater . Contains ...
... Breakwaters and dredging of anchorage area of 26 acres to 16 feet . Sea walls across ledge in the southeast corner of the harbor , enlarging the anchorage basin and deepen- ing of entrance . Small boat basin with breakwater . Contains ...
Page 1965
... breakwater piers . Shore connection to each breakwater and dredging of maneuvering area . Construction of new east breakwater and enlarge- ment of maneuvering basin . Documents H. Ex . Doc . 94 , 48th Cong . , 2d sess Annual report for ...
... breakwater piers . Shore connection to each breakwater and dredging of maneuvering area . Construction of new east breakwater and enlarge- ment of maneuvering basin . Documents H. Ex . Doc . 94 , 48th Cong . , 2d sess Annual report for ...
Page 1967
... breakwater entrance and the pierheads with a width varying from a minimum of 600 feet to a maximum of 1,100 feet , 32 feet deep at the breakwater entrance , gradually decreasing to 28 feet at the pierheads ; a stilling basin of 20 acres ...
... breakwater entrance and the pierheads with a width varying from a minimum of 600 feet to a maximum of 1,100 feet , 32 feet deep at the breakwater entrance , gradually decreasing to 28 feet at the pierheads ; a stilling basin of 20 acres ...
Page 1968
... breakwaters ; and stabiliza- tion repairs to Superior entry south pier were completed . The costs of the various items of work done during the year are as follows : $ 76,659.42 for dredging ; $ 6,902.72 for breakwater repairs ...
... breakwaters ; and stabiliza- tion repairs to Superior entry south pier were completed . The costs of the various items of work done during the year are as follows : $ 76,659.42 for dredging ; $ 6,902.72 for breakwater repairs ...
Page 1973
... breakwater pier on the east side of the harbor , and the proposed parapets on these structures in a manner satisfactory to the Chief of Engineers . None of the above requirements have been complied with . Terminal facilities . - Within ...
... breakwater pier on the east side of the harbor , and the proposed parapets on these structures in a manner satisfactory to the Chief of Engineers . None of the above requirements have been complied with . Terminal facilities . - Within ...
Other editions - View all
Common terms and phrases
1st sess 2d sess Accounts payable acre-feet additional amount needed Allegheny River Annual Report anticipated allotment breakwater bridge Chief of Engineers Committee resolution completion of existing Condition at end Cong construction Control Act approved Cost and financial Creek cubic yards dredging end of fiscal ending June 30 Estimated additional amount existing project feet deep feet wide financial summary 1946 fiscal year 1951 Fiscal year ending fiscal years prior Flood Control Act Harbor Act hired labor including fiscal July June 28 Lake Michigan latest published map levee Location locks and dams Los Angeles River low-water datum miles Missouri River mouth Ohio River Ohio River Basin Operations and results operations.-The balance unexpended percent complete pier plans and specifications profitably expended project depth project was authorized Proposed operations.-The balance Public Works Committee reservoir results during fiscal revetment riprap River and Harbor tion total cost Total to June tributaries turning basin United Wabash River
Popular passages
Page 2173 - Avenue to the navigation turning basin ; all generally in accordance with the plans of the district engineer, and with such modifications thereof as in the discretion of the Chief of Engineers may be advisable...
Page 1477 - June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Upper Mississippi River Basin described in Flood Control Committee Document No. 1, Seventy-fifth Congress, first session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 1887 - That the sum of $25,000,000 is hereby authorized to be appropriated as an emergency fund to be expended under the direction of the Secretary of the Army and the supervision of the Chief of Engineers...
Page 1814 - ... in navigable streams and tributaries thereof, when in the opinion of the Chief of Engineers such work is advisable in the interest of flood control: Provided, That not more than $100,000 shall be expended for this purpose for any single tributary from the appropriations for any one fiscal year.
Page 1666 - Hereafter, it shall be the duty of the Secretary of War to prescribe regulations for the use of storage allocated for flood control or navigation at all reservoirs constructed wholly or In part with Federal funds provided on the basis of such purposes, and the operation of any such project shall be In accordance with such regulations...
Page 1961 - Reservoirs; subject to the condition that for each local flood-protection project, no expenditures will be made until local interests give assurances satisfactory to the Secretary of the Army that they will (a) provide without cost to the United States all lands, easements, and rightsof-way necessary for the construction of the project; (6) hold and save the United States free from damages...
Page 1930 - The reservoir will have a total storage capacity of 294,800 acre-feet. The reservoir will be operated as a unit of a coordinated reservoir system for flood protection in the east fork of the Little Miami River and the Ohio River Valleys and will also provide recreational opportunities.
Page 1565 - The general comprehensive plan for flood control and other purposes in the Missouri River Basin approved by the Act of June 28, 1938...
Page 1509 - The improvement is subject to the conditions that local interests make a cash contribution of $40,000 toward the construction cost, and give assurances satisfactory to the Secretary of War that they will provide, without cost to the United States, all lands, easements, and rights-of-way necessary for the construction of the project...
Page 1700 - States, or municipalities ; and provided further, that in case high dams are built before the United States shall have built the projected locks and low dams which are to be replaced, the United States shall contribute to the cost of the substituted structures an amount equal to the estimated cost of the work of navigation for which substitution is made.