... right abutment Embankment construction in progress on zones 1 , 2 , and 3 View looking east at dam construction progress from triangulation station " C " located on right dam abutment Downstream embankment zones 1 and 3 progress viewed ...
... right abutment Embankment construction in progress on zones 1 , 2 , and 3 View looking east at dam construction progress from triangulation station " C " located on right dam abutment Downstream embankment zones 1 and 3 progress viewed ...
Page 8
... right abutment , one between the weir and the headworks , and one between the head- works and the left abutment . A plan and sections of the diversion dam are shown in appendix F. The weir section , near the right side of the creek ...
... right abutment , one between the weir and the headworks , and one between the head- works and the left abutment . A plan and sections of the diversion dam are shown in appendix F. The weir section , near the right side of the creek ...
Page 35
... right abutment , left abutment spillway locations were ruled out . ( a ) Alternate Spillway Design . --The initial field layout proposed a 50 - foot - wide , con- crete , free overflow spillway on the right abutment . The alinements of ...
... right abutment , left abutment spillway locations were ruled out . ( a ) Alternate Spillway Design . --The initial field layout proposed a 50 - foot - wide , con- crete , free overflow spillway on the right abutment . The alinements of ...
Contents
Steinaker Service Canal | 9 |
Design EARTH | 17 |
Specially compacted earthfill | 25 |
17 other sections not shown
Common terms and phrases
access shaft acre-feet Anchor bars Ashley Creek Ashley Valley bentonitic Bureau of Reclamation capacity cemented centerline Central Utah project chute CLAY COBBLES concrete conduit construction contractor crest dam embankment discharge ditches diversion dam downstream drain drill elevation emergency spillway excavation factor of safety gate chamber GRAVEL grout HANGER high plasticity high-pressure gates holes hydraulic jump inches inlet installation intake structure irrigation laboratory layers Line located material medium plasticity miles moist moisture outlet works stilling outlet works tunnel percent piezometer poorly graded pressure PROJ RECLAMATION CENTRAL Reservoir level gage reservoir water right abutment riprap Rock Point Canal SAND SANDSTONE SCALE OF FEET second-feet SECTION A-A shaft house SHALE SILT fines slightly calcareous slope soft STANAKER steel Steinaker Dam Steinaker Reservoir Steinaker Service Canal stilling basin storage Uinta Mountains unit area upstream VANE TESTS varved ventilation Vernal Field Vernal unit vertical wall water surface zone