Technical Record of Design and Construction: Steinaker Dam, Constructed 1959-1961. Central Utah Project, Utah1963 - Steinaker Dam - 132 pages |
From inside the book
Results 1-3 of 15
Page 32
... placement detail , see Section & A ~~~~ " Tubing TRENOM SECTION 8-8 Mon trench FOUNDATION TYPE Section at Sta 14 + 50 Tips No. 37-4 , 39-4 , 41 - A , and 43 ~ A ~~~ - Safected material Offset trench Tubing Tips No. 37 , 39 . 41 and 43 ...
... placement detail , see Section & A ~~~~ " Tubing TRENOM SECTION 8-8 Mon trench FOUNDATION TYPE Section at Sta 14 + 50 Tips No. 37-4 , 39-4 , 41 - A , and 43 ~ A ~~~ - Safected material Offset trench Tubing Tips No. 37 , 39 . 41 and 43 ...
Page 86
... placement . These cracks were not uniformly spaced , and extended from at or near the floor to the top of the wall , and were usually paired . As of late 1962 , no change in the extent or width of the cracks had been observed since they ...
... placement . These cracks were not uniformly spaced , and extended from at or near the floor to the top of the wall , and were usually paired . As of late 1962 , no change in the extent or width of the cracks had been observed since they ...
Page 122
... placement of concrete was made in tunnel . Dec. 1 , 1959 Major embankment construction activities were suspended for the Feb. - —— -- winter season . 11 , 1960 The gage and needle valve installation was completed in piezometer terminal ...
... placement of concrete was made in tunnel . Dec. 1 , 1959 Major embankment construction activities were suspended for the Feb. - —— -- winter season . 11 , 1960 The gage and needle valve installation was completed in piezometer terminal ...
Contents
Steinaker Service Canal | 9 |
Design EARTH | 17 |
Specially compacted earthfill | 25 |
17 other sections not shown
Common terms and phrases
access shaft acre-feet Anchor bars Ashley Creek Ashley Valley bentonitic Bureau of Reclamation capacity cemented centerline Central Utah project chute CLAY COBBLES concrete conduit construction contractor crest dam embankment discharge ditches diversion dam downstream drain drill elevation emergency spillway excavation factor of safety gate chamber GRAVEL grout HANGER high plasticity high-pressure gates holes hydraulic jump inches inlet installation intake structure irrigation laboratory layers Line located material medium plasticity miles moist moisture outlet works stilling outlet works tunnel percent piezometer poorly graded pressure PROJ RECLAMATION CENTRAL Reservoir level gage reservoir water right abutment riprap Rock Point Canal SAND SANDSTONE SCALE OF FEET second-feet SECTION A-A shaft house SHALE SILT fines slightly calcareous slope soft STANAKER steel Steinaker Dam Steinaker Reservoir Steinaker Service Canal stilling basin storage Uinta Mountains unit area upstream VANE TESTS varved ventilation Vernal Field Vernal unit vertical wall water surface zone