O'Sullivan Dam: Constructed 1947-1949 |
From inside the book
Results 1-5 of 19
Page i
... Outlet pipe 19. Design assumptions 77797 13 13 13 3333 17 17 C. Outlet Works 17 17 20 20 D. Modifications 21 20 . General CHAPTER IV -- CONTRACT ADMINISTRATION 27 21. Specifications and contracts 22 . Subcontractors 23. Order for ...
... Outlet pipe 19. Design assumptions 77797 13 13 13 3333 17 17 C. Outlet Works 17 17 20 20 D. Modifications 21 20 . General CHAPTER IV -- CONTRACT ADMINISTRATION 27 21. Specifications and contracts 22 . Subcontractors 23. Order for ...
Page iii
... outlet pipe 14 Aerial view of Government camp 15 Diamond drill operating in cutoff trench 26 29 32 16 Cutoff trench after lean concrete had been placed to fill holes in rock 32 17 Grout machine used in grouting foundation of O'Sullivan ...
... outlet pipe 14 Aerial view of Government camp 15 Diamond drill operating in cutoff trench 26 29 32 16 Cutoff trench after lean concrete had been placed to fill holes in rock 32 17 Grout machine used in grouting foundation of O'Sullivan ...
Page 14
... drain holes Lot 15 ' crs .. Relocated county road ( not in this contract ) ... Outlet funnel- . Concrete grout cap and grout holes on E cut - off trench as ... pipe and grout holes as directed . CONCRETE GROUT CAP DETAILS - EMBANKMENT ...
... drain holes Lot 15 ' crs .. Relocated county road ( not in this contract ) ... Outlet funnel- . Concrete grout cap and grout holes on E cut - off trench as ... pipe and grout holes as directed . CONCRETE GROUT CAP DETAILS - EMBANKMENT ...
Page 17
... outlet . To provide an outlet , a large amount of excavation would be necessary for the required 4,000 - foot channel and this location was abandoned . Another possible location , in ... Outlet pipe Design assumptions 77797 3333 Outlet Works.
... outlet . To provide an outlet , a large amount of excavation would be necessary for the required 4,000 - foot channel and this location was abandoned . Another possible location , in ... Outlet pipe Design assumptions 77797 3333 Outlet Works.
Page 19
... outlet pipe . Tunnel portal Sta 8-60.00 066 905 965 . -940 955 EL940.0 950 940 936 930 1940.0 Outlet channel -929 -930 Excavation details for valve house and concrete lining not shown JOE STA ladylla instiequ saint don ) -81 Mox.W.S. ...
... outlet pipe . Tunnel portal Sta 8-60.00 066 905 965 . -940 955 EL940.0 950 940 936 930 1940.0 Outlet channel -929 -930 Excavation details for valve house and concrete lining not shown JOE STA ladylla instiequ saint don ) -81 Mox.W.S. ...
Common terms and phrases
acre-feet APPENDIX approximately Assumed rock line Axis of dam axis station backfill basalt borrow area borrow pit bottom Bureau of Reclamation canal cement channel cobbles Columbia Basin project Compact silt concrete construction Crab Creek crossarm cubic feet cubic yards cutoff trench dam embankment discharge Drilling grout holes east Embankment settlement Excavation feet downstream feet per second Figure foundation Frenchman Hills gate chamber Grand Coulee Dam Gravelly sand grout cap high-pressure gate inches inlet irrigation Lake loam loam Sandy located loom miles moisture O'Sullivan Dam Oakum Order for Changes Piezometer placed placement portal Potholes Dam Potholes reservoir Quincy Basin riprap sand and gravel sand Sandy Sandy gravel Sandy loam SCALE OF FEET Sendy settlement installations shaft silt Silty loam Slope Soap Lake sond Sondy spillway steel pipe stilling basin suitable Surface settlement trashrack structure tubing tunnel lining U. S. Bureau upstream valve house zone 1 material
Popular passages
Page 1 - Culee on the Columbia River, about 92 miles, by highway, west of Spokane. The irrigable area of the Columbia Basin project is situated in the Big Bend country of Washington between the Snake and Columbia Rivers. The lands extend northward some 85 miles from the junction of the two rivers at Pasco on the southern edge.
Page 1 - ... The Public Service Electric and Gas Company of New Jersey has contracted with Offshore Power Systems to develop a pair of floating nuclear plants in the Atlantic Ocean, three miles off the New Jersey coast. The ocean here is about 40 feet deep. The plants are protected by an enormous breakwater 300 feet wide at the base and 30 feet wide at the top. The breakwater is designed to withstand winds, waves, and storms of much greater magnitude than have been observed in this location. Together, the...
Page 2 - ... 2,300 acres at the maximum water-surface elevation of 1,570, eliminates the necessity for a very expensive canal along the steep walls of the Grand Coulee and saves the loss of about 47 feet in the elevation of the water surface at the south end of the Coulee. It also allows a more efficient use of water for power development and irrigation by providing storage for water which can be pumped •when the supply in the river is ample, and in turn decreases the amount of power water required for...
Page 1 - ... will operate the dam; yes, sir. COLUMBIA BASIN PROJECT, WASHINGTON PROJECT DATA AUTHORIZATION Initially authorized by section 2, Rivers and Harbors Act of August 30, 1935 (49 Stat. 1028, 1039) ; authorized and reauthorized by Columbia Basin Project Act of March 10, 1943 (57 Stat. 14). LOCATION The project is located in the central part of the State of Washington, with its major feature, the Grand Coulee Dam, situated on the Columbia River approximately 95 miles west of Spokane, Wash. The project...
Page 38 - The slopes of the dam, which are faced, are 1 to 1 on the upstream, and 2 to 1 on the downstream side...
Page 54 - ... 25 Drilling grout holes in stage between depths of 0 foot and 35 feet 50,453.45 lin.