O'Sullivan Dam: Constructed 1947-1949 |
From inside the book
Results 1-5 of 15
Page iii
... compacting zone 1 materials 25 Placing the downstream rock blanket on a 2 to 1 slope 40 41 26 Placing upstream riprap on face of zone 3 material 42 27 Equipment for processing zone 1 material 42 28 Batch plant , mixer , and pumpcrete ...
... compacting zone 1 materials 25 Placing the downstream rock blanket on a 2 to 1 slope 40 41 26 Placing upstream riprap on face of zone 3 material 42 27 Equipment for processing zone 1 material 42 28 Batch plant , mixer , and pumpcrete ...
Page iv
... 31 Crossarm of settlement apparatus in place before backfilling and compacting 32 Embankment settlement installation 33 Surface settlement installations plan Page 47 47 49 50 50 CHAPTER I -- INTRODUCTION - 1. General . The Columbia iv.
... 31 Crossarm of settlement apparatus in place before backfilling and compacting 32 Embankment settlement installation 33 Surface settlement installations plan Page 47 47 49 50 50 CHAPTER I -- INTRODUCTION - 1. General . The Columbia iv.
Page 13
... compacted by rolling to 6 - inch layers . The slopes of this zone were allowed to vary somewhat but in general are 1-1 / 4 to 1 upstream and 3/4 to 1 down- stream . Zone 2 is a transition zone of selected silt , sand , and gravel placed ...
... compacted by rolling to 6 - inch layers . The slopes of this zone were allowed to vary somewhat but in general are 1-1 / 4 to 1 upstream and 3/4 to 1 down- stream . Zone 2 is a transition zone of selected silt , sand , and gravel placed ...
Page 14
... compacted rood surfacing Concrete curb . 5-5-12 Selected gravelly material Rock riprop Creek EL 930- A46 218 R1000 ... compacted layers . Semi - pervious - selected silt , sand and gravel- graduated in coarseness to outer slopes , rolled ...
... compacted rood surfacing Concrete curb . 5-5-12 Selected gravelly material Rock riprop Creek EL 930- A46 218 R1000 ... compacted layers . Semi - pervious - selected silt , sand and gravel- graduated in coarseness to outer slopes , rolled ...
Page 15
... compacted surfacing -Excavation line for rock -12 refill on rock excavation 10 0 10 SCALE OF FEET لبيسيليسيا Concrete grout cap and grout holes on as directed . cut - off french 100 + 00 00 20 Cor . Sec . 16-17 TITN RISE WN Sta 0 + 00 ...
... compacted surfacing -Excavation line for rock -12 refill on rock excavation 10 0 10 SCALE OF FEET لبيسيليسيا Concrete grout cap and grout holes on as directed . cut - off french 100 + 00 00 20 Cor . Sec . 16-17 TITN RISE WN Sta 0 + 00 ...
Common terms and phrases
acre-feet APPENDIX approximately Assumed rock line Axis of dam axis station backfill basalt borrow area borrow pit bottom Bureau of Reclamation canal cement channel cobbles Columbia Basin project Compact silt concrete construction Crab Creek crossarm cubic feet cubic yards cutoff trench dam embankment discharge Drilling grout holes east Embankment settlement Excavation feet downstream feet per second Figure foundation Frenchman Hills gate chamber Grand Coulee Dam Gravelly sand grout cap high-pressure gate inches inlet irrigation Lake loam loam Sandy located loom miles moisture O'Sullivan Dam Oakum Order for Changes Piezometer placed placement portal Potholes Dam Potholes reservoir Quincy Basin riprap sand and gravel sand Sandy Sandy gravel Sandy loam SCALE OF FEET Sendy settlement installations shaft silt Silty loam Slope Soap Lake sond Sondy spillway steel pipe stilling basin suitable Surface settlement trashrack structure tubing tunnel lining U. S. Bureau upstream valve house zone 1 material
Popular passages
Page 1 - Culee on the Columbia River, about 92 miles, by highway, west of Spokane. The irrigable area of the Columbia Basin project is situated in the Big Bend country of Washington between the Snake and Columbia Rivers. The lands extend northward some 85 miles from the junction of the two rivers at Pasco on the southern edge.
Page 1 - ... The Public Service Electric and Gas Company of New Jersey has contracted with Offshore Power Systems to develop a pair of floating nuclear plants in the Atlantic Ocean, three miles off the New Jersey coast. The ocean here is about 40 feet deep. The plants are protected by an enormous breakwater 300 feet wide at the base and 30 feet wide at the top. The breakwater is designed to withstand winds, waves, and storms of much greater magnitude than have been observed in this location. Together, the...
Page 2 - ... 2,300 acres at the maximum water-surface elevation of 1,570, eliminates the necessity for a very expensive canal along the steep walls of the Grand Coulee and saves the loss of about 47 feet in the elevation of the water surface at the south end of the Coulee. It also allows a more efficient use of water for power development and irrigation by providing storage for water which can be pumped •when the supply in the river is ample, and in turn decreases the amount of power water required for...
Page 1 - ... will operate the dam; yes, sir. COLUMBIA BASIN PROJECT, WASHINGTON PROJECT DATA AUTHORIZATION Initially authorized by section 2, Rivers and Harbors Act of August 30, 1935 (49 Stat. 1028, 1039) ; authorized and reauthorized by Columbia Basin Project Act of March 10, 1943 (57 Stat. 14). LOCATION The project is located in the central part of the State of Washington, with its major feature, the Grand Coulee Dam, situated on the Columbia River approximately 95 miles west of Spokane, Wash. The project...
Page 38 - The slopes of the dam, which are faced, are 1 to 1 on the upstream, and 2 to 1 on the downstream side...
Page 54 - ... 25 Drilling grout holes in stage between depths of 0 foot and 35 feet 50,453.45 lin.