Long Lake Dam and Main Canal: Technical Record of Design and Construction. Constructed 1946-1951, Columbia Basin Project

Front Cover

From inside the book

Common terms and phrases

Popular passages

Page 1 - 1. General. - The Columbia Basin project is located in the central part of the State of Washington (fig. 1) east of the Columbia River. The primary purpose of the project is the ultimate reclamation of 1,
Page 1 - 500 feet wide at the base, and 30 feet wide at the top. The spillway in the center of the dam crest is
Page 2 - River is ample, and, in turn, decreases the amount of power water required for pumping when the river supply is low.
Page 11 - the dam is a moistened and rolled embankment of clay, sand, and gravel with
Page 2 - water for power development and irrigation by providing storage for water which can be pumped when the supply in the
Page 46 - to carry on the full amount of work under contract on the Columbia Basin project.
Page 125 - sections of heavy, heat-treated alloy steel grid segments bolted onto circular side plates.
Page vii - 49 50 51 52 53 54 55 LIST OF FIGURES (Continued) Title
Page 97 - the contracting officer extended the time for completion of the work by

Bibliographic information