Canyon Ferry Dam and Powerplant: Technical Record of Design and Construction, Canyon Ferry Unit, Missouri River Basin Project, Constructed 1849-54United States Department of the Interior, Bureau of Reclamation, 1958 - Canyon Ferry Dam - 325 pages |
From inside the book
Results 1-5 of 21
Page 75
... girders of welded box section . Two beams attached to the top of the crane are cantilevered out on the upstream side to support the main hoist trolley . All field connections were made with rivets or turned bolts in reamed holes . The ...
... girders of welded box section . Two beams attached to the top of the crane are cantilevered out on the upstream side to support the main hoist trolley . All field connections were made with rivets or turned bolts in reamed holes . The ...
Page 83
... girder bridge crosses the spillway and is used for a roadway across the dam . Some of the features of the spillway structure are shown in figure 50 . 53. Crest and Apron - Original Design . The original spillway design flood was ...
... girder bridge crosses the spillway and is used for a roadway across the dam . Some of the features of the spillway structure are shown in figure 50 . 53. Crest and Apron - Original Design . The original spillway design flood was ...
Page 87
... girders were designed for the following loading conditions , the allow- able unit stresses being expressed in terms of normal allowable unit stresses : Allowable unit stresses ( 1 ) Dead load , H20 - S16 live load and impact . 1.00 ( 2 ) ...
... girders were designed for the following loading conditions , the allow- able unit stresses being expressed in terms of normal allowable unit stresses : Allowable unit stresses ( 1 ) Dead load , H20 - S16 live load and impact . 1.00 ( 2 ) ...
Page 88
... girder Roodway Elostic filler joint Rest && girder E Pier 5 and bearing Sto 7 + 29 Pier and E beering Sto 5 + 01 38 ... GIRDERS AND BEARINGS . DECK HOISTS . CRANE HAIL LIGHTS .. HANDRAIL DRAINS . PIERS . 296-0-571 8572 296-0-573 574 294 ...
... girder Roodway Elostic filler joint Rest && girder E Pier 5 and bearing Sto 7 + 29 Pier and E beering Sto 5 + 01 38 ... GIRDERS AND BEARINGS . DECK HOISTS . CRANE HAIL LIGHTS .. HANDRAIL DRAINS . PIERS . 296-0-571 8572 296-0-573 574 294 ...
Page 88
... Girder Well plate 40-0 ° R Insid upstream som skin plate -Anchor girder 16-35 " Anchor bolts , upset to per intermediate prer FLOW 51 34.5 Rodial gate- 0-15 7.0-15 E of Pias GATE No. 4 Pier No Sta 5 0 Arc of rotation 42 ° 00 ° PLAN OF ...
... Girder Well plate 40-0 ° R Insid upstream som skin plate -Anchor girder 16-35 " Anchor bolts , upset to per intermediate prer FLOW 51 34.5 Rodial gate- 0-15 7.0-15 E of Pias GATE No. 4 Pier No Sta 5 0 Arc of rotation 42 ° 00 ° PLAN OF ...
Common terms and phrases
axis BASIN PROJECT block 12 blockouts bolts bridge BUREAU OF RECLAMATION cable Canyon Ferry Dam circuit breaker cofferdam compressor concrete conduit construction contraction joints contractor cooling crane crete cubic dam and powerplant designed discharge diversion downstream draft tube drain drilled electrical elevation embedded equipment excavation expansion joint fault feet Figure floor flume foundation gallery furnished gantry crane girders Government camp grout guide bearing header hoist HORNFELS installed kilovolts left abutment lift liner load located maximum metal meter MISSOURI RIVER BASIN Montana Power Company operation penstock pipe placed plant plate pounds per square pozzolan pressure pumping intake relay reservoir revolutions per minute right abutment river outlet rock seal shaft spillway square inch stator stay ring steel storage structure sump sump pumps supply surface switch switchyard thrust bearing tion transformer trashrack turbine upstream valve vertical voltage wall welded wire