Canyon Ferry Dam and Powerplant: Technical Record of Design and Construction, Canyon Ferry Unit, Missouri River Basin Project, Constructed 1849-54United States Department of the Interior, Bureau of Reclamation, 1958 - Canyon Ferry Dam - 325 pages |
From inside the book
Results 1-5 of 10
Page 99
... blockouts and on anchor bolts , after which they were concreted in place . The bottom seat consists of a brass plate which was also placed on anchor bolts and installed in blockouts . The lifting frame is fabricated from struc- tural ...
... blockouts and on anchor bolts , after which they were concreted in place . The bottom seat consists of a brass plate which was also placed on anchor bolts and installed in blockouts . The lifting frame is fabricated from struc- tural ...
Page 140
... blockouts and anchored by means of adjustable anchor bolts and was concreted in place after proper alinement . The lifting beam is fabricated from struc- tural steel and has ice - tong - type grappling hooks which act in unison by ...
... blockouts and anchored by means of adjustable anchor bolts and was concreted in place after proper alinement . The lifting beam is fabricated from struc- tural steel and has ice - tong - type grappling hooks which act in unison by ...
Page 222
... blockouts varied with the size and shape of the opening and the amount of embedded material in the blockout . The slump and maximum size of aggregate were carefully selected so that com- plete consolidation could be obtained . The mix ...
... blockouts varied with the size and shape of the opening and the amount of embedded material in the blockout . The slump and maximum size of aggregate were carefully selected so that com- plete consolidation could be obtained . The mix ...
Page 242
... blockouts left in the mass concrete of the spillway , and were adjusted to true line and grade and embedded in concrete prior to the erection of the gates . The end seal plates were mounted on anchor bolts in blockouts extending up the ...
... blockouts left in the mass concrete of the spillway , and were adjusted to true line and grade and embedded in concrete prior to the erection of the gates . The end seal plates were mounted on anchor bolts in blockouts extending up the ...
Page 248
... Blockouts were left in the mass concrete in which the anchor bolts were embedded . The anchor bolt threads were cleaned by " chasing " them with a die nut , and one nut was placed on each anchor bolt . The sections were installed on the ...
... Blockouts were left in the mass concrete in which the anchor bolts were embedded . The anchor bolt threads were cleaned by " chasing " them with a die nut , and one nut was placed on each anchor bolt . The sections were installed on the ...
Common terms and phrases
axis BASIN PROJECT block 12 blockouts bolts bridge BUREAU OF RECLAMATION cable Canyon Ferry Dam circuit breaker cofferdam compressor concrete conduit construction contraction joints contractor cooling crane crete cubic dam and powerplant designed discharge diversion downstream draft tube drain drilled electrical elevation embedded equipment excavation expansion joint fault feet Figure floor flume foundation gallery furnished gantry crane girders Government camp grout guide bearing header hoist HORNFELS installed kilovolts left abutment lift liner load located maximum metal meter MISSOURI RIVER BASIN Montana Power Company operation penstock pipe placed plant plate pounds per square pozzolan pressure pumping intake relay reservoir revolutions per minute right abutment river outlet rock seal shaft spillway square inch stator stay ring steel storage structure sump sump pumps supply surface switch switchyard thrust bearing tion transformer trashrack turbine upstream valve vertical voltage wall welded wire