Apx. II Pumping Plants (Examples) Make adjustments in rvey line as directed EL.2481.30- EL.2471.30 MOIST SAND, NO CLAY MOIST SAND, SOME -DO. DO. EL. 2469.80 AUGER BORING No.2 EL. 2482.40 EL.2480.40 EL. 2478.40 YELLOW SAND, MED. FINE, DRY AUGER BORING No. 8 (HOLE ABANDONED AT EL.2478.4, COULD NOT EL. 2506.60 -SANDY MAT'L. EL. 2499.60 Apx. II Pumping Plants (Examples) Floor drain-, Rotor erection support 0. D Floor drain, Air receiver Hatch 12° Pipe sleeve, Sump E1-25.00 "Expansion joint Floor drain Air compressors +Air intake duct to Cooling water discharge compressors. Damp proofing. First stage concrete Second stage concrete |