and sluicing the ice as much as possible out of the pond through the logway gate opening.

The logway is a section of flat ogee spillway 10 feet wide, the crest of which is 10.75 feet above the sluiceway gate sills and 5 feet below the normal spillway crest. The section is located adjacent to the spillway. The forebay is separated from the silt basin by a concrete training wall which sets on the edge of the silt basin floor, and has the same top elevation as the spillway crest. Timbers and iron pipe set in the wall afford additional guidance to floating timber. When not in operation the logway is closed by a wooden gate which brings the crest to the level of the spillway crest.

CONSTRUCTION

During normal high water, leakage of about 5 second-feet through low-lying gravel appears in the borrow pit. In the early years of operation the downstream face of the dike also showed dampness indicating that the assumed hydraulic gradient was about correct. Silt and windblown sand have now accumulated on the upstream slope, tightening it so that the dampness no longer shows on the lower slope. Prevailing winds confine wave action to the spillway section, and no breaching of the upstream face of the dike ever occurred.

Flow into the canal is regulated by six structural-steel radial gates, 10 feet wide and 10 feet high, set in a headworks front 70 feet wide and 22 feet 6 inches high. The gates have a top seal against curtain walls 12 feet 6 inches high. They are lifted by a cable at each side of each gate winding on drum hoists. Counterweights to reduce externally applied hoisting forces are housed in slots in the 24-inch partition walls which separate the gates. In front of the headgates and 4 feet lower than the gate sills is a concrete silt basin, about 70 by 70 feet in plan, upon which the silt load of the river drops before the water enters the canal. At full capacity of the canal the water will flow across the upper end of the basin at a velocity of 3 feet per second.

At the side of the silt basin and in line with the axis of the spillway is a battery of four 10- by 12-foot radial gates of the same general design as the headgates. The sills of these gates are at the level of the silt basin which is 2 feet above the normal low water below the dam and 9 feet above the adjacent fore apron. The full canal discharge will flow across the silt basin at a velocity of 8 feet per second when the canal headgates are closed and the sluicegates opened wide. This is calculated to sweep the basin clean. Both sets of gates are operated by a gasoline engine moving on a track above them.

In 13 years of operation the pond above the dam has practically silted full. The silt basin is scoured clean annually, usually in October after the close of the irrigation season. Even these scouring periods must be short as canal storage runs the power plant but a few hours. The scoured out silt lodges below the dam to be removed by next season's flood. While grade retrogression is general to the river, none has occurred at the dam to date, possibly because no severe floods have occurred since its construction. As a result tailwater remains high, the jump at the foot of the ogee section is drowned, and scour below the fore apron, if any, is filled up as high water recedes. The apron is always found covered with a tight layer of gravel.

Development has not yet required operation at full canal capacity. A principal operating difficulty is slush ice, which is combatted most successfully by taking water out of the silt basin above canal grade, through hand operated wooden gates placed in the stop plank grooves,

Work was started by Government forces in July 1921, and completed May 1923. The working period included one flood season and two winter seasons. The first winter season was unusually severe and caused work interruption of 10 weeks. Before the arrival of the flood season, the headworks, silt basin, sluiceway, logway, and one 27-foot section of the spillway were completed, or above high water so that work could be continued. Also, there was completed that part of the dike south of the old river channel, which was used as a bypass during construction. After the flood, work was prosecuted continuously to completion except for minor delays occasioned by railway strikes and impassable roads, both of which stopped delivery of materials. The second winter was so mild that concrete work in favorable locations was possible with ordinary winter pouring procedure.

The main construction equipment was gasoline-driven draglines which were used on the project principally for canal excavation. Two machines with 1)-cubic yard buckets and 45-foot booms, and one with 274-cubic yard bucket and 75-foot boom were interchanged between canal excavation and dam construction. These machines cut diversion channels, stripped foundations, acted as traveling cranes for moving forms and light equipment, loaded the dike materials into wagons and concrete aggregate on screening equipment, all as required. The concrete mixer was a h-cubic yard machine, spotted at various points as work progressed. Distribution was mainly by 3-cubic yard cars, operated by hand on a narrow gage track built on a trestle sufficiently high to permit chuting to most of the work.

The cobblestone admixture was not run through the mixer, but placed as plum rock brought to the trestle from the screening plant or dike building job in -cubic-yard cars pulled by a gasoline hoist. Generally, excavations were opened wide enough to avoid the use of sheeting. Unwatering was by means of gasoline-driven centrifugal pumps and hand-power diaphragm pumps. The largest pump used

[graphic]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors][subsumed]
[subsumed][subsumed][subsumed][ocr errors][subsumed]
[ocr errors][subsumed][subsumed][subsumed]
[blocks in formation]
[ocr errors]
[ocr errors][subsumed]
[subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][ocr errors][ocr errors][subsumed][ocr errors][ocr errors][subsumed][ocr errors][ocr errors][subsumed][subsumed][ocr errors][subsumed][subsumed][ocr errors][subsumed][ocr errors][ocr errors][ocr errors][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][subsumed][subsumed]

80

Sound Pool E155380...

750 fore Apron 2 Std. Pipe Rau

SECTION La

og er

Surs formed on E15582.7

Fore Agron reinterped with herselbers 2010

DEL 5580,5 bat osa center concrete with mar dis

longe or surface of Eron Pie

The borraron shelbed eitration S548 toner, Hechthon oney

one for steps or by

Murpiny
Boom of 4

as of fortepron 6 inches
Pes 2012

hot points to be inches section shall be no les har 2 fed below Top of meron

The upstream cut off wall stail & thick

and Shertory fort info sourd rock onge v 1210 C04

Son of wall shall be a feel thick and Ascia 66

Shall extend to v on 500 elow sceny w bungy and te nuhon 5541 below spiller Place rest of course gume und alleen

Revised June 19, 1922 Arised al 1927

DEPARTMENT OF THE INTERIOR
Bors 18*crs. Both ways

UNITED STATES RECLAMATION SERVICE.

RIVERTON PROJECT-WYOMING 73.843 Mass Concrete

WIND RIVER DIVERSION DAM

DETAILS OF SLUICEWAYS AND LOGWAY ...A.C. UMH. sec . al Varogs

en HPB- . Free Perised od. 18. 1971

72 36-C-20

[subsumed][ocr errors][ocr errors][ocr errors][subsumed][subsumed][ocr errors][subsumed][ocr errors][ocr errors][subsumed][ocr errors][subsumed][ocr errors][subsumed][subsumed][merged small]

was a 6- by 8-inch centrifugal, driven by a 15-horsepower engine.

The principal item of rock excavation was the cut-off trenches, which were 2 feet wide and 3 and 5 feet deep below the respective spillway and fore apron bottoms. To avoid shattering the adjacent rock, line drilling on both sides of each trench was necessary. Holes were spaced about 6 to 8 inches on centers and a channelling effect was produced with a special tool fitted to a pneumatic hammer. Light blasting in center holes broke out the channeled material. Excavation in two lifts was found best for the 5-foot trench which had one side 7 feet deep. Compressed air was furnished by two 7- by 6-inch portable compressors driven by 20-horsepower gasoline engines, and one 8- by 8-inch, twocylinder, stationary compressor driven by tractor.

Consideration was given to building the dike with clay material from the mesa to the south, but this was abandoned in favor of using a mixture of soil and cobblestones found in

the river bottom. The material was loaded by dragline, from borrow pits on the downstream side of the dike or from spillway excavation, into 3-cubic yard dump wagons hauled by 10-ton caterpillar tractors, two or three wagons constituting a train according to lift. The borrow pits were wet, and as a result of the method of excavating and loading the top sand and lower cobbly gravel, arrived on the job wet and thoroughly mixed. The mixture was spread in layers by a standard road grader pulled by horses.

Large cobblestones were worked to the outside faces by horse-drawn stone boats. The travel of placing and levelling produced sufficient compaction and a dike was produced which was more rodent proof than if the clay material had been used. The deficiency of riprap on the two faces was made up with cobblestones, hauled from the river bed and the concrete aggregate screening plant. The latter was operated without crushing apparatus as the river bed material ran sufficiently high in moderate sizes to make crushing

[blocks in formation]

COSTS

do

do......

.22

The summary in the next column is a feature cost report which also shows the quantities involved.

Materials were hauled 37 miles over primitive roads, mostly by contractor, using rather light trucks and at the following rates:

Cents Cement, per sack . . . . . . . . . . . . . . . . . . 28-38-44 Lumber, per 100 pounds ............. 40–46-48 Miscellaneous materials, per 100 pounds . ....... 40-45

Labor was generally plentiful and efficient. Costs for housing had to be borne by the work because of the distance from habitations. These are shown in the item of camp operation and maintenance.

Right-of-way -------
Clearing.----------------
Excavation, class I.------
Excavation, classes 2 and 3.
Stripping dike site.......
Embankment.....
Riprap..-.-.-...
Temporary diversion........
Concrete, plain -----------
Concrete, reinforced..
Woodwork..- --------
Gates....
Back511...

-------Camp maintenance............ Engineering and inspection.......

Subtotal, field costs --.... Superintendence and accounts.... General expense

Total cost.------------

Acres.... 405.6 $9, 602. 25 $23. 70 T...do...

83 6,784. 17 81.70 Cubic yards 37, 268 14, 843. 49 . 40

5,010 21, 783.35! 4. 35

19,961 4, 338.53 ..do.--- 99, 153 68, 875. 76 .70 ...do....... 7, 495 9, 150. 69 1.22 Job..-.-.. 33, 845.96 Cubic yards | 12, 175 | 113, 226.63 9.30 ...do ..

5,037 97, 079.93 19.28 1,000 ft.b.m. 10.4 628. 36 60.30 Pounds.....1 208, 975 19, 399.00 Cubic yards 8, 563 9,352. 10 1.09 Job...-..-.

19, 585.71 14.8 14, 294. 98 13.5 442, 790.91

8, 651.82 12.0 32, 397. 66. 17.3 483, 840. 39

1 Percent.

PART THREE

SPECIAL ARTICLES

[graphic]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]

Biver

[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]
[ocr errors]

OISE- 4DEADWOOD
PAYETTES DAM

SHOSHONE
ISLAND PK
Optario

GRASSY

DAM
DAM

LAKE DAM Shoshone
Boise

Reservoir
o Ketchum UPPER | JACKSON
O

SNAKE RIVER
Arrowrock O

17 DAM W Y Jo MXN

RIVERTON

"KEN FALLS DAMAI

BULL LAKE Riverton

Alcova Casp MINIDOKA ) )

Pathfinder ALCOVA DI

Reservoir YSEMINOE -

PDAM
- - -
GREAT Hyrum HYRUM
| SALTRA
| SALTRA B

HYRUM DAM
OGDEN RIVER

Granger
I LAKE ogden PPINE VIEW DAMI
| Salt Lake City
Salt La

Echo Reservoir-a

Echo Reservoir t - --
PROVO RIV. SPAM
Provod DAM

N LAKE
Strawberry
STRAWBERRY Reservoir
VALLEY Spring City /

GRAND
O Ely 1 SANPETEO Ephraim S VALLEY
U TAH CO TAYLOR PL

Grand Junction

T DAM
V

COM PAHGI

UNCOM PAHGI
O Marysville
Ploche

TAYLOA PI

[ocr errors]
[ocr errors]
[ocr errors]

Santa

[ocr errors]
[ocr errors]

Sa

[subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed]
[subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][merged small][subsumed][ocr errors][subsumed]
« PreviousContinue »