Willard Dam, Constructed 1957-1964: Weber Basin Project, Utah

Front Cover
U.S. Department of the Interior, Bureau of Reclamation, 1967 - Arthur V. Watkins Dam (Utah) - 190 pages
 

Common terms and phrases

Popular passages

Page 112 - ... ordered will be as follows: a. Distributing materials as required during construction of the dam access roadway in accordance with item 1 above for the lump sum of $125,229 b. Assisting the Government in performing support work in accordance with item 2 above for the lump sum of $14,484 The total net adjustment in the amount due under the contract by reason of the changes ordered herein is an increase of $139,713.
Page 65 - ... are shown in tables 3, 4, and 5. It can be seen from these data that satisfactory densities, well within specifications requirements, were obtained in all zone 1 material.

Bibliographic information