Willard Dam, Constructed 1957-1964: Weber Basin Project, UtahU.S. Department of the Interior, Bureau of Reclamation, 1967 - Arthur V. Watkins Dam (Utah) - 190 pages |
Common terms and phrases
acre-feet alinement Axis baseplate borrow pit BUREAU OF RECLAMATION CLAY compacted construction of Willard contract contractor crest Dam test embankment DENVER dragline drainage drilled dry density east segment borrow Embankment measurement point equipment travel excavated excess pore-fluid pressure explorations fill foundation settlement gravel haul hole inches intake channel INTERIOR BUREAU lean Liquid limit little SAND loading materials saturated maximum medium firm moisture content motor graders obtained odor Ogden Ogden River Original ground surface outlet percent piezometer tip pipe Plasticity index Pumping Plant RECLAMATION WEBER BASIN reservoir area RESERVOIR WATER riprap SCALE OF FEET scrapers section A-A segment borrow area shear strength shown on figure SILT slope soft soil Soil Classification south drain specifications stage terminal house thick Toe Drain tractor trucks Utah vane shear tests vane tests Weber Basin project Weber River Willard Canal Willard Dam Willard dike Willard Reservoir zone 1 material
Popular passages
Page 112 - ... ordered will be as follows: a. Distributing materials as required during construction of the dam access roadway in accordance with item 1 above for the lump sum of $125,229 b. Assisting the Government in performing support work in accordance with item 2 above for the lump sum of $14,484 The total net adjustment in the amount due under the contract by reason of the changes ordered herein is an increase of $139,713.
Page 65 - ... are shown in tables 3, 4, and 5. It can be seen from these data that satisfactory densities, well within specifications requirements, were obtained in all zone 1 material.