Boysen Dam and Powerplant: Constructed 1947-19521957 - Boysen Dam - 266 pages |
From inside the book
Results 1-5 of 41
Page ii
... bridge ( f ) Highway bridge ( g ) Compressor house ( h ) Left and right inlet walls ( i ) Chute walls ( j ) Chute floor ( k ) Stilling basin walls ( 1 ) Stilling basin floor Structural details ( a ) Approach channel ( b ) Left inlet ...
... bridge ( f ) Highway bridge ( g ) Compressor house ( h ) Left and right inlet walls ( i ) Chute walls ( j ) Chute floor ( k ) Stilling basin walls ( 1 ) Stilling basin floor Structural details ( a ) Approach channel ( b ) Left inlet ...
Page vi
... Bridges for CB & Q railroad relocation -- Specifications No. 1901 ( a ) Extra work orders 93. Clearing part of ... bridge --Specifications No. R6 - Bn4 ( b ) Boysen Dam transmission line connecting road -- Specifica- tions No. 601C ...
... Bridges for CB & Q railroad relocation -- Specifications No. 1901 ( a ) Extra work orders 93. Clearing part of ... bridge --Specifications No. R6 - Bn4 ( b ) Boysen Dam transmission line connecting road -- Specifica- tions No. 601C ...
Page 10
... bridges was involved in the relocation of the roadway of the Chicago , Burlington , and Quincy Railroad , which passes along the eastern side of the Boysen Reservoir . The tunnel begins above the reservoir water surface and descends to ...
... bridges was involved in the relocation of the roadway of the Chicago , Burlington , and Quincy Railroad , which passes along the eastern side of the Boysen Reservoir . The tunnel begins above the reservoir water surface and descends to ...
Page 34
... bridge Sta 6.19.00 -Compressor house for ice prevention system Stop log slot E : 4690.00 ` Sto 5.50.00 PLAN ... Bridge , Sta 5 + 86.34 Radial gate hoist -EL 4754.00 El 4743.00 Metal gate seal 40-9ER . 20-0 Hwy bridge , St. 6 + 19.00 ...
... bridge Sta 6.19.00 -Compressor house for ice prevention system Stop log slot E : 4690.00 ` Sto 5.50.00 PLAN ... Bridge , Sta 5 + 86.34 Radial gate hoist -EL 4754.00 El 4743.00 Metal gate seal 40-9ER . 20-0 Hwy bridge , St. 6 + 19.00 ...
Page 36
... bridge ( both bridges span the spillway at the level of the dam crest ) ; a concrete compressor house ; a concrete - lined level stilling basin and a riprap - lined outflow channel from the stilling basin to the river channel . The ...
... bridge ( both bridges span the spillway at the level of the dam crest ) ; a concrete compressor house ; a concrete - lined level stilling basin and a riprap - lined outflow channel from the stilling basin to the river channel . The ...
Contents
147 | |
153 | |
156 | |
161 | |
162 | |
164 | |
164 | |
165 | |
60 | |
66 | |
73 | |
79 | |
88 | |
95 | |
101 | |
111 | |
114 | |
122 | |
128 | |
136 | |
143 | |
170 | |
172 | |
173 | |
175 | |
177 | |
180 | |
189 | |
195 | |
203 | |
203 | |
211 | |
233 | |
Common terms and phrases
000 second-feet acre-feet anchor axis backfill Bighorn River Boysen Dam Boysen Powerplant Boysen Reservoir Brass breakers bridge Bronze bulkhead gate channel circuit circuit breakers compressor concrete construction contractor copper crest cubic foot deck designed diorite discharge diversion tunnel downstream draft tube drawing embankment equipment excavation flood foundation gate structure girders Government camp Gray iron Gros Ventre grout grout holes header hoist holes were drilled hydraulic inlet wall installed leaf left abutment load located material maximum normal operating outlet pipe penstock percent pier piezometer pounds per square powerhouse pressure pump radial gates railroad tunnel reinforced relocated reservoir water reservoir water surface right abutment ring RING SEAL riprap river rock roof sandstone SCALE OF FEET seal SECTION SHOSHONI side slope spillway square inch steel stilling basin storage surge tank switchyard tailwater tank Thermopolis transformer trashrack structure turbine unit upstream valve vertical zone