| Mechanical engineering - 1864 - 590 pages
...outer casing of the crane, and runs on the bevilled base of the cast iron crane pillar H. The base G of the crane is sufficiently long to secure its stability...all cases 5000 feet per minute ; and in the overhead traversers the heavy loads are lifted at the rate of 1 foot 1\ inches per minute, the total leverage... | |
| N. E. Spretson - Founding - 1878 - 622 pages
...outer casing of the crane, and runs up the bevelled base of the castiron crane pillar H. The base G of the crane is sufficiently long to secure its stability...all cases 5000 feet per minute, and in the overhead traversers the heavy loads arc lifted at the rate of 1 foot 7£ inches per minute, the total leverage... | |
| N. E. Spretson - Founding - 1880 - 618 pages
...casing of the crane, and runs up the bevelled base of the castiron crane pillar H. The base G of {he crane is sufficiently long to secure its stability...all cases 5000 feet per minute, and in the overhead traversers the heavy loads are lifted at the rate of 1 foot 7£ inches per minute, the total leverage... | |
| John Sharp - Founding - 1900 - 914 pages
...outer casing of the crane, and runs up the bevelled base of the cast-iron crane pillar H. The base G of the crane is sufficiently long to secure its stability...all cases 5000 feet per minute, and in the overhead traversers the heavy loads are lifted at the rate of 1 foot 7£ inches per minute, the total leverage... | |
| John Sharp - Founding - 1900 - 846 pages
...outer casing of the crane, and runs up the) bevelled base of the cast-iron crane pillar H. The base G of the crane is sufficiently long to secure its stability...all cases 5000 feet per minute, and in the overhead traversers the heavy loads are lifted at the rate of 1 foot 7£ inches per minute, the total leverage... | |
| John Sharp - Founding - 1900 - 810 pages
...bevelled base of the cast-iron crane pillar EL The base G of the crane is sufficiently long to Becure ita stability when the maximum load is lifted over the...all cases 5000 feet per minute, and in the overhead traversers the heavy loads are lifted at the rate of 1 foot 7£ inches per minute, the total leverage... | |
| Institution of Mechanical Engineers (Great Britain) - Mechanical engineering - 1863 - 998 pages
...outer casing of the crane, and runs on the bevffied base of the cast iron crane pillar H. The base G of the crane is sufficiently long to secure its stability when the maximum loud is lifted over the rail, or lengthways of the crane base. In these cranes, owing to the high speed... | |
| |