Central Business District Study: Study Design ; City of Detroit Community Renewal Program1968 - Central business districts - 174 pages |
Common terms and phrases
15 man days 20 man days action program development aerial photographs ambient quality analyzed architectural engineer 15 areas in need assistant architectural engineer assistant traffic engineer block buildings capacity CBD STUDY Central Business District circulation clerks Objective commercial loading curb parking days 1 draftsman days 1 intermediate Department of Streets Determine existing status determine the number downtown area downtown Detroit draftsman Objective Economic Activity factors field survey floor space guidelines human activity Identify Areas INCENTIVES STUDY intermediate planner intermediate social economist intersections inventory link counts major Method metro-core Non-Building Structure notational shorthand PARKING STUDY passengers patterns perceptual analysis planner 13 plans Potential recommendations relationships reviewed selected senior assistant architectural senior assistant traffic senior planner senior social economist short-range street network Streets and Traffic structure STUDY 1 senior Study design material STUDY WORK DESCRIPTION tabular TABULATE AND MAP traffic investigators TRAFFIC MOVEMENT trends Vehicular Movement