Cachuma Dam: Technical Record of Design and Construction. Cachuma Project, California |
Common terms and phrases
acre-feet approx approximately axis station backfill bedrock borrow area BOULDERS BUREAU OF RECLAMATION butterfly valve Cachuma Dam CACHUMA PROJECT Carpinteria cement centerline channel chute COBBLES concrete construction contract contractor control house counterweight County Water crest cutoff trench DETAIL discharge diversion drain elevation embankment excavation EXCESS SILT Figure flange floor flow foundation gate chamber GRAVEL WITH SAND grout cap high-pressure gate hoist hollow-jet valves hydraulic inches inlet intake structure INTERIOR BUREAU JET VALVE joints laying length left abutment load located maximum Monterey formation operation outlet pipe outlet tunnel percent piers piezometer plate pozzolan pressure pump radial gates RECLAMATION CACHUMA reservoir water reservoir water surface riprap SAND CLAY BINDER SAND WITH EXCESS Santa Barbara Santa Barbara County Santa Ynez River Santa Ynez Valley SCALE OF FEET second-feet SECTION A-A SHALE SILT SILTSTONE slab Slip joint slope specifications spillway steel tests tractor trashrack upstream wall Water Districts welded