Davis Dam and Powerplant: Technical Record of Design and Construction, Davis Dam Project, Constructed 1942-53 |
Contents
28 | |
32 | |
47 | |
50 | |
63 | |
69 | |
75 | |
80 | |
84 | |
96 | |
102 | |
103 | |
109 | |
118 | |
119 | |
126 | |
132 | |
145 | |
155 | |
161 | |
162 | |
167 | |
170 | |
182 | |
226 | |
228 | |
235 | |
241 | |
243 | |
249 | |
257 | |
259 | |
265 | |
271 | |
272 | |
277 | |
278 | |
304 | |
309 | |
310 | |
318 | |
324 | |
340 | |
343 | |
349 | |
351 | |
365 | |
372 | |
Other editions - View all
Common terms and phrases
20 feet A-line abutment anchor bars axis B-zone backfill block blockouts capacity cement clay seams cofferdam Colorado River concrete construction contraction joints cubic feet cubic yards cutoff trench Davis Dam deck depth downstream drain drilling and grouting earthquake elevation equipment excavation fault zone feet per second floor foot forebay channel foundation gallery gantry crane gate girders gneiss Government camp gravel gravity wall grout holes hoist Hoover Dam horizontal installed intake structure Lake Mead lift load located material maximum normal operation outlet structure penstock percent piers pipe placed plant Porphyritic pounds per square powerplant pozzolan pressure pumps Pyramid Canyon reservoir reservoir water rhyolite riprap river roadway rock sand SCALE OF FEET seal side slope spillway and outlet square inch steel stilling basin stockpile stoplogs stresses switch switchyard tailwater tests tion transformer trashrack trolley tunnel turbine unit vertical Zone grouting