Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-3 of 3
Page 34
... Drains were provided under or near the spillway structures to re- lieve uplift pressures and prevent saturation and / or erosion of earth materials . Paved gutters , sewer - pipe ... diameter manhole located near the bottom of the downstream ...
... Drains were provided under or near the spillway structures to re- lieve uplift pressures and prevent saturation and / or erosion of earth materials . Paved gutters , sewer - pipe ... diameter manhole located near the bottom of the downstream ...
Page 94
... diameter sewer pipe and construct- ing drains with uncemented joints 35 Furnishing 6 - inch diameter sewer pipe and construct- ing drains with uncemented joints 36 Furnishing 8 - inch diameter sewer pipe and construct- ing drains with ...
... diameter sewer pipe and construct- ing drains with uncemented joints 35 Furnishing 6 - inch diameter sewer pipe and construct- ing drains with uncemented joints 36 Furnishing 8 - inch diameter sewer pipe and construct- ing drains with ...
Page 95
... diameter sewer pipe with cemented joints 43 Furnishing and laying 18- inch diameter sewer pipe with cemented joints Labor and materials by contractor Quantity Amount Unit Unit cost Total cost 554.9 lin . ft . 2.50 $ 1,387.25 160.0 lin ...
... diameter sewer pipe with cemented joints 43 Furnishing and laying 18- inch diameter sewer pipe with cemented joints Labor and materials by contractor Quantity Amount Unit Unit cost Total cost 554.9 lin . ft . 2.50 $ 1,387.25 160.0 lin ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation