What people are saying - Write a reviewWe haven't found any reviews in the usual places. Contents
132 other sections not shown Common terms and phrases69-kilovolt amperes anchor bars approximately Arch Dam basin block breaker cable cantilever centerline circuit circuit breaker cofferdam coils Colorado River construction contraction joints contractor cooling crane diameter discharge diversion tunnel downstream face draft tube drainage drainage basin drilled electrical elevation embedded equipment excavation expansion joint feet fixed-wheel gates Flaming Gorge Dam foundation gallery gantry crane grouting holes horizontal hydraulic installed keyway kilovolts left abutment lift load located mass concrete maximum motor operating outlet pipes penstock percent placement plant pounds per square powerplant pressure protection pump reading station reinforcement relays reservoir reservoir water resistance thermometers right abutment ring-follower gate river outlet rock shale shale zones shear shown on figure slope spillway square inch station station-service stoplogs storage strain meter structural steel switch switchyard tailwater temperature thermometer tion turbine unit upper upstream face Utah vertical voltage wall References from web pagesFOSS AQUEDUCT: TECHNICAL RECORD OF DESIGN AND CONSTRUCTION. jamestownh EM 1110-2-4300 Change 1 30 Nov 87 APPENDIX A SELECTED BIBLIOGRAPHY TABLE OF CONTENTS DAM VISUALS: THE CHANGING VISUAL ARGUMENT FOR THE GLEN CANYON DAM FOSS AQUEDUCT: TECHNICAL RECORD OF DESIGN AND CONSTRUCTION ... Canal Context and Evaluation Procedures recnoコード 書名 著者名 発行所 発行年月日 ページ数 553 21 Bibliographic information |